Laserfiche WebLink
• <br />• <br />• <br />page 4 -17 <br />Paragraph 1: Revise to remove discussion of higher, market based <br />forecast and <br />Paragraphs 1, 3, 5: revise number of affordable units to reflect lower <br />forecast. <br />Chapter 6 <br />Transportation <br />Plan <br />The lower forecast will be run through the traffic model. Some results <br />will change slightly. For example, Fig. 6.4 will show lower traffic <br />forecasts. Fig. 6.5 likely will show a few less roads that cross the <br />threshold for increasing to 4 -lanes. Post -2030 data will not change <br />because they are based on full build out of city. <br />Chapters 7 & 8, <br />Sanitary Sewer <br />and Water Plans <br />These utility plans are based on the full build out of the city, which is <br />not changed by the lower 2020 and 2030 forecasts. Five -year staging <br />was not completed yet to allow decision on which forecast. This now <br />can be prepared. <br />page 9 -5 <br />Table 9 -1: Revise to reflect lower forecasts. <br />