Laserfiche WebLink
mniDoT TP- 2460 - 0112 -92) <br />SHEET 1 OF 1 SHEETS <br />State of Minnesota - Department of Transportation <br />• CHANGE ORDER # 19 <br />• <br />Contractor: Lunda Construction Co. <br />Address: 15601 Clayton Avenue S. <br />Rosemount, MN 55068 <br />State Project No.: 0280 -55 <br />Contract No. Z07502 <br />Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr. <br />In accordance with the terms of this Contract, you are hereby authorized and instructed to perforrn the Work as altered by the following provisions. <br />For Liquidated Damages on the Contract as a whole: <br />The Engineer with the concurrence of the City of Lino Lakes has determined that in accordance with Mn /DOT <br />Specification 1807 will assess Liquidated Damages in accordance with Specification 1807.1 <br />Per Special Provision S -29.1, all work under the Contract, excluding maintenance and final clean up, was to be <br />completed July 13, 2008. The Contractor on August 8, 2008 had substantially completed the work having <br />C.S.A.H. 23 open to traffic for safe and convenient use by the traveling public. As per table 1807 -1 a daily <br />charge of $3,000.00 will be assessed for twenty six (26) days for a total of $78,000.00. <br />In accordance with 1807.2 and Special Provision S -29.1, the Department will assess reduced Liquidated <br />Damages from November 13, 2008 through May 4, 2009 in the amount of $500 per day for maintenance and <br />final clean up. During the period from February 5, 2009 through April 27, 2008 the project was in suspension. <br />The Contractor utilized ninety one (91) days. Liquidated damages of $45,500.00 will be assessed. <br />As per Specification 1807, Total Liquidated Damages assessed for the Project $123,500.00 <br />CHANGE IN CONTRACT TIME <br />Due to this change the Contract Time: <br />a. Is increased ( ) by Working Days Issued By: <br />Is decreased ( ) by Working Days Project/ResidceCounty Engineer Date <br />Is increased ( ) by _ Calendar Days <br />Is decreased ( ) by Calendar Days <br />Approved By: <br />City of Lino Lakes <br />Date <br />b. Is not changed (X ) <br />Approved By: <br />c. May be revised if the work affected Anoka County Date <br />the controlling operation ( ) <br />Accepted By. :: _,. 1., .. J-1-16 <br />Contractor's Authorized Representative Date <br />Original to Project Engineer; copies to Contractor, City of Lino Lakes, Anoka County <br />