Laserfiche WebLink
• Arnt Construction Company,Inc. <br /> Interim Use Narrative <br /> 2209 Phelps Road <br /> March 19,2010 <br /> AfAR 1� <br /> Owner: Paul K. Miller Ll 0 <br /> 1100 Jardin Drive 4 <br /> Naples, FL 34104 <br /> Buyer: Arnt Investments <br /> 219+0 Phelps Road <br /> Hugo,Mid 55038 <br /> Area of Interim Use: -7.76 Acres North of Phelps Road <br /> Buildings: <br /> The.site has an office and attached maintenance shop,two metal storage buildings <br /> constructed in 1969,a cell tower and new equipment building. The office is being used <br /> • by MrMOT for the County Road 14 Bridge Project. The maintenance shop and storage <br /> buildings are being used by Arnt Construction Co., Inc. <br /> Site drainage: <br /> The contour map grading plan denotes the present and proposed drainage patterns,. We <br /> intend to install a sand filter upstream of the apron on the southeast corner of the <br /> PropertY- <br /> Operadon: <br /> The fenced in storage yard will be used to parr equipment, stockpile fieldstone,riprap, <br /> salvage cut stone,recycled class 6 gravel,#2 keystone, granular borrow,storm sewer, <br /> waterrnain and sanitary sewer appurtenances, and occasionally topsoil. The material will <br /> be hauled out via Anoka County Road 84(Otter Lake Read). <br /> Normally all rabble and recycled class 6 will be stockpiled south of Phelps Road. We <br /> receive rubble at 2190 Phelps Road from our projects,Moline Concrete,Anoka County, <br /> City of Lino Lakes, City of Centerville,City of Hugo and the residences in the area. <br /> We operate on a 24-hour basis in order to comply with certain contracts with Mn/DOT <br /> and various Minnesota counties. <br />