Laserfiche WebLink
COMPENSATING CHANGE -ORDER NO. 1 <br />2009 SURFACE WATER MANAGEMENT PROJECT <br />CITY OF LINO LAKES, MINNESOTA <br />DA PROJECT NO. 14292.004 <br />PERIOD ENDING: May 28, 2010 <br />CONTRACT QUANTITY UNIT AMOUNT NET CONTRACT <br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE CHANGE AMOUNT <br />PROJECT 1 - ROHAVIC LANE <br />1 MOBILIZATION LS 1 1.0 $ 500.00 $ 500.00 $ $ 500.00 <br />2 ROCK CONSTRUCTION ENTRANCE LS 1 1.0 $ 500.00 $ 500.D0 $ - $ 500.00 <br />3 CLEAN /OPEN STORM SEWER OUTFALL EA 1 1.0 $ 500.00 $ 500.00 $ - $ 500.00 <br />4 CLEAN STORM SEWER PIPE LF 200 200.0 $ 8.00 $ 1,600.00 $ - $ 1,600.00 <br />5 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 1 7.0 $ 250.00 $ 1,750.00 $ 1,500.00 $ 250.00 <br />6 REGRADE DITCH LF 10D 84.0 $ 30.00 $ 2,520.00 $ (480.00) $ 3,000.00 <br />7 CLASS 111 RIPRAP W/ FABRIC CY 5 0.0 $ 150.00 $ $ (750.00) $ 750.00 <br />B EROSION CONTROL BLANKET CATEGORY 3 SY 200 150.0 $ 2.00 $ 300.00 $ (100.00) $ 400.00 <br />9 SEED / RESTORATION LS 1 1.0 $ 1,000.00 $ 1,000.00 $ - $ 1,000.00 <br />SUBTOTAL PROJECT 1 $ 8,670.00 $ 170.00 $ 8,500.00 <br />PROJECT 2 - TOMAHAWK TR AND CHIPPEWA TR DITCH REPAIR <br />1 MOBILIZATION LS 1 1.0 $ 500.00 $ 500.00 $ - $ 500.00 <br />2 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 20 29.0 $ 200.00 $ 5,800.00 $ 1,800.00 $ 4,000.00 <br />3 COMMON BORROW (FILL OVER PIPE) CY 110 178.0 $ 10.00 $ 1,780.00 $ 680.00 $ 1,100.00 <br />4 SALVAGE AND REINSTALL 30" FES EA 1 1.0 $ 1,000.00 $ 1,000.00 $ - $ 1,000.00 <br />5 STORM SEWER MANHOLE, TYPE 409 EA 1 1.0 $ 3,500.00 $ 3,500.00 $ - $ 3,500.00 <br />6 30" RCP STORM SEWER, CLASS 3 LF 48 48.0 $ 100.00 $ 4,600.00 $ - $ 4,800.00 <br />7 TRENCH STABILIZATION ROCK / PIPE BEDDING LF 48 54.0 $ 10.00 $ 540.00 $ 60.00 $ 480.00 <br />8 CLASS III RIPRAP W/ FABRIC CY 30 30.0 $ 100.00 $ 3,000.00 $ - $ 3,000.00 <br />9 SILT FENCE LF 50 50.0 $ 3.00 $ 150.00 $ - $ 150.00 <br />10 TOPSOIL BORROW FOR EXISTING YARD AREA CY 60 25.0 $ 12.00 $ 300.00 $ (420.00) $ 720.00 <br />11 SOD FOR EXISTING YARD AREA SY 360 360.0 $ 4.00 $ 1,440.00 $ - $ 1,440.00 <br />12 SEED / RESTORATION OVER NEW PIPE LS 1 1.0 $ 1,000.00 $ 1,000.00 $ $ 1,000.00 <br />SUBTOTAL PROJECT 2 $ 23,810.00 $ 2,120.00 $ 21,690.00 <br />PROJECT 3 -FAWN LANE EQUALIZER PIPE REPAIR <br />1 MOBILIZATION LS 1 1.0 $ 500.00 $ 500.00 $ - $ 500.00 <br />2 REMOVE BITUMINOUS PAVEMENT SY 90 97.0 $ 3.00 $ 291.00 $ 21.00 $ 270.00 <br />0 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 1 1.0 $ 300.00 $ 300.00 $ $ 300.00 <br />REMOVE STORM SEWER PIPE LF 12 20.0 $ 20.00 $ 400.00 $ 160.00 $ 240.00 <br />28" X 18" RCP ARCH SEWER LF 8 8.0 $ 100.00 $ 800.00 $ $ 800.00 <br />6 28" X 18" RCP ARCH FES W /TRASHGUARD EA 2 2.0 $ 1,000.00 $ 2,000.00 $ - $ 2,000.00 <br />7 PLACE BENTONITE AROUND PIPE (MATERIAL SUPPLIED) LF 16 20.0 $ 20.00 $ 400.00 $ 80.00 $ 320.00 <br />8 TRENCH STABILIZATION ROCK / PIPE BEDDING LF 20 20.0 $ 10.00 $ 200.00 $ - $ 200.00 <br />9 AGGREGATE BASE CLASS 5 (6" DEPTH) TN 30 42.0 $ 20.00 $ 840.00 $ 240.00 $ 600.00 <br />10 BITUMINOUS WEAR COURSE (2" DEPTH) TN 20 14.0 $ 200.00 $ 2,800.00 $ (1,200.00) $ 4,000.00 <br />11 CLASS III RIPRAP W/ FABRIC CY 20 20.0 $ 100.00 $ 2,000.00 $ - $ 2,000.00 <br />12 SEED / RESTORATION LS 1 1.0 $ 800.00 $ 800.00 $ - $ 800.00 <br />SUBTOTAL PROJECT 3 $ 11,331.00 $ (699.00) $ 12,030.00 <br />PROJECT 4 - WEST SHADOW LAKE DRIVE CROSSING <br />1 MOBILIZATION LS 1 1.0 $ 500.00 $ 500.00 $ - $ 500.00 <br />2 CLEAN /OPEN STORM SEWER OUTFALL EA 3 1.0 $ 500.00 $ 500.00 $ (1,000.00) $ 1,500.00 <br />3 CLEAN STORM SEWER PIPE LF 400 0.0 $ 8.00 $ - $ (3,200.00) $ 3,200.00 <br />4 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 3 2.0 $ 200.00 $ 400.00 $ (200.00) $ 600.00 <br />5 REGRADE DITCH LF 250 41.0 $ 25.00 $ 1,025.00 $ (5,225.00) $ 6,250.00 <br />6 EROSION CONTROL BLANKET CATEGORY 3 SY 300 35.0 $ 2.00 $ 70.00 $ (530.00) $ 600.00 <br />7 SPRINKLER REPAIR LS 1 0.0 $ 50.00 $ - $ (50.00) $ 50.00 <br />8 SOD FOR EXISTING YARD AREA SY 200 0.0 $ 4.00 $ - $ (800.00) $ 800.00 <br />9 SEED / RESTORATION LS 1 0.3 $ 1,000.00 $ 250.00 $ (750.00) $ 1,000.00 <br />SUBTOTAL PROJECT 4 $ 2,745.00 $ (11,755.00) $ 14,500.00 <br />• <br />