Laserfiche WebLink
ESTIMATE NO. 2(F) <br />PERIOD ENDING: November 30, 2007 <br />2007 OVERLAY PROJECT <br />CITY OF LINO LAKES, MINNESOTA <br />41,A PROJECT NO. 13849.001 <br />ITEM CONTRACT QUANTITY UNIT AMOUNT <br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE <br />1 MOBILIZATION EA 1 1.0 $ 2,500.00 $ 2,500.00 <br />2 RECLAIM BITUMINOUS SY 14,720 14,720.0 $ 0.40 $ 5,888.00 <br />3 HAUL OUT EXCESS MILLINGS (LV) CY 725 762.0 $ 5.00 $ 3,810.00 <br />4 RESHAPE MILLINGS (3% CROWN) RS 43.2 43.2 $ 130.00 $ 5,616.00 <br />5 BITUMINOUS BASE COURSE 2360 TYPE LV 3 TN 1,800 1,730.0 $ 41.42 $ 71,656.60 <br />6 BITUMINOUS WEARING COURSE 2360 TYPE LV 4 TN 1,450 1,412.0 $ 44.21 $ 62,424.52 <br />7 BITUMINOUS MATERIAL FOR TACK COAT GA 800 800.0 $ 1.50 $ 1,200.00 <br />8 BITUMINOUS CURBING LF 500 118.0 $ 5.00 $ 590.00 <br />9 SAWCUT BITUMINOUS DRIVEWAYS LF 220 190.0 $ 2.00 $ 380.00 <br />10 REMOVE DRIVEWAY MATERIAL SY 250 124.0 $ 3.00 $ 372.00 <br />11 BIT. WEARING COURSE 2360 TYPE LV 4 (FOR DRIVES) SY 250 124.0 $ 15.00 $ 1,860.00 <br />12 GRADER FOR DRAINAGE CORRECTION IN CUL -DE -SACS HR 5 10.0 $ 100.00 $ 1,000.00 <br />13 REMOVE AND REPLACE CATCH BASIN (TYPE 402) EA 6 5.0 $ 750.00 $ 3,750.00 <br />TOTAL ESTIMATE NO. 2(F) $ 161,047.12 <br />• <br />• <br />