My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2008-024 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2008
>
2008-024 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2014 12:51:26 PM
Creation date
9/3/2014 11:11:57 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
02/25/2008
Council Meeting Type
Regular
Resolution #
08-24
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mn/DOT TP- 2460- 0112 -92) <br />SHEET 1 OF 1 SHEETS <br />State of Minnesota - Department of Transportation <br />CHANGE ORDER # 9 <br />Contractor: Lunda Construction Co. <br />Address: 15601 Clayton Avenue S. <br />Rosemount, MN 55068 <br />State Project No.: 0280 -55 <br />Contract No. Z07502 <br />Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr. <br />In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions. <br />The aggregate test reports and material disposition forms compiled by Mn/DOT indicate that on 8 -23 -07 the <br />coarse aggregate for ready -mix concrete supplied by AME 5 Ham Lake failed to meet the gradation <br />requirements for Mn/DOT Specification 3137 CA -50. <br />This concrete was used for Curb and Gutter. <br />Upon recommendation of the Concrete Office, the concrete containing the deficient material will be allowed to <br />remain in place at a reduced price. The dollar amount to be deducted from the Contractor's project payable <br />monies is computed as shown below in the Estimate of Costs. <br />Estimate of Costs <br />•ecrease - Group No. #1 @ 100% <br />Description Unit <br />Deduct for Failing Gradation CY <br />Lab. No. 1A =1Q <br />CHANGE IN CONTRACT TIME <br />Due to this change the Contract Time: <br />a. Is increased ( ) by Working Days <br />Is decreased ( ) by Working Days <br />Is increased ( ) by Calendar Days <br />Is decreased ( ) by Calendar Days <br />b. Is not changed (X ) <br />c. May be revised if the work affected <br />the controlling operation ( ) <br />riginal to Proje <br />Quantity <br />100 <br />Unit Price <br />-$3.00 <br />Total Credit this Change Order <br />Issued By: <br />Project/Resideggi"County Engineer <br />Amount <br />- $300.00 <br />- $300.00 <br />Date <br />Approved By: <br />City of Lino Lakes <br />Approved By: <br />Anoka County <br />Date <br />Accepted By: L-76. <br />Contractor's Authorized Representative Date <br />Engineer; copies; to Contractor, -City of Lino Lakes, Anoka County <br />
The URL can be used to link to this page
Your browser does not support the video tag.