Laserfiche WebLink
Mn /DOT TP- 2460- 0112 -92) <br />• <br />SHEET 1 OF 1 SHEETS <br />State of Minnesota - Department of Transportation <br />CHANGE ORDER # 11 <br />Contractor: Lunda Construction Co. <br />Address: 15601 Clayton Avenue S. <br />Rosemount, MN 55068 <br />State Project No.: 0280 -55 <br />Contract No. Z07502 <br />Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr. <br />In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions. <br />Due to a staking error the south approach panel for Bridge No. 02817 stage I was constructed as surveyed and <br />now in conflict with the new guardrail that is needed to be installed. After review the Project Engineer has <br />determined that the approach panel needs to have the portion in conflict with the new guardrail removed. <br />This Change Order directs the Contractor to furnish all equipment, materials and labor necessary to remove the <br />portion of the approach panel in conflict with the new guardrail. <br />All work will be performed in accordance with the pertinent portions of the Special Provisions, Mn/DOT <br />Standard Specifications, Mn/DOT Standard Plates and as directed by the Engineer. <br />Payment to the Contractor for this work will be at the Mn/DOT 1904 Force Account, as shown below in the Estimate of <br />•ost: <br />ESTIMATE OF COST <br />Force Account <br />Description <br />Approach Panel Removals <br />Distribution: S.P. 0280 -55 Group 01 — 100% <br />CHANGE IN CONTRACT TIME <br />Due to this change the Contract Time: <br />a. Is increased ( ) by Working Days <br />Is decreased ( ) by Working Days <br />Is increased ( ) by Calendar Days <br />Is decreased ( ) by Calendar Days <br />b. Is not changed (X ) <br />c. May be revised if the work affected <br />the controlling operation ( ) <br />Issued By: <br />Amount <br />$1,600.00 <br />�,��r� 'Resident/ 1Tr Engineer Date <br />Approved By: <br />City of Lino Lakes <br />Date <br />Approved By: <br />Anoka County <br />Accepted By:,.:__ L <br />Contractor's Authorized Representative <br />11110riginal to Project Engineer; copies to Contractor, City of Lino Lakes, Anoka County <br />Date <br />1Z -ZB - °" <br />Date <br />