Laserfiche WebLink
ATTACHMENT A <br />SUMMARY OF IMPROVEMENT COSTS <br />DEVELOPER INSTALLED IMPROVEMENTS <br />AUGUST 25, 2008 <br />• PROJECT NAME: Byrne Langer Addition NUMBER OF 2 <br />REU's: <br />APPLICANT: Scott and Victoria Byrne ASSESSED AREA (ac.): 0.92 <br />BUDGET DEVELOPER CITY ESCROW <br />ITEM NECESSARY IMPROVEMENTS COST NOTE IMP. (X) IMP. (Y) AMOUNT (Z) <br />1 SITE GRADING Estimate e $40,000 <br />2 EROSION CONTROL Estimate e $0 <br />3 SITE ENGINEERING & SURVEYING Estimate e $0 <br />4 LANDSCAPING Estimate e $0 <br />5 STREET CONST. Estimate e $5,000 <br />6 STORM SEWER CONST. <br />A. Trunk Estimate e <br />B. Lateral Estimate e <br />C. Surface Water Mgmt. Charge (s.f.) $0.124 c $0 <br />7 SANITARY SEWER CONST. <br />A. Sanitary Sewer $5,000 <br />B. Trunk Unit Charge (REU) $2,690 a $2,690 <br />C. Front Footage $33.00 c $0 <br />SWATERMAIN CONST. <br />A. Watermain $5,000 <br />B. Trunk Unit Charge (REU) $3,560 a $3,560 <br />C. Front Footage $23.00 c $0 <br />TOTALS: $55,000 $6,250 $0 <br />NOTE: City Improvements costs are based on one lot of the two lots. <br />City Improvements for one of the lots was assessed with the Clear Water Creek 4th Addition Development Agreement. <br />See Attachment B for security amounts to be posted. <br />NOTE: <br />a: Cost by City policy <br />b: Estimated Cost or Budget by City <br />c: Previously Assessed <br />d: Cash Requirement per Agreement with Park Board <br />e: Provided by Developer <br />f: Estimate by Feasibility Study <br />• <br />