My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2008-088 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2008
>
2008-088 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2014 10:28:26 AM
Creation date
9/4/2014 12:01:44 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
08/25/2008
Council Meeting Type
Regular
Resolution #
08-88
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Byrne Langer Addition <br />Development Contract <br />August 25, 2008 <br />c) Protect streets from erosion deposits. This should include a <br />combination of roadside silt fences, roadside sod strips, catch basin <br />rock bale inlet protection, rock construction entrances, straw mulch, <br />and/or street sweeping. <br />4. The Developer shall place iron monuments at all lot and block corners and at <br />all other angle points on boundary lines. Iron monuments shall be placed <br />after all street and lawn grading has been completed in order to preserve the <br />lot markers for future property owners. Lot corner irons on the back <br />property line shall be installed so that the top of the iron corresponds to the <br />finished ground elevation in accordance with the approved grading plan - <br />guard stakes shall be appropriately installed to mark these irons. <br />5. The Developer shall promptly clear dirt and debris, within public right -of- <br />ways, and drainage and utility easements, resulting from construction by <br />the Developer, its purchasers, builders and contractors within five (5) days <br />after notification by the City. The Developer or its assigns shall be <br />responsible for all necessary street and storm sewer maintenance including <br />street sweeping, storm sewer cleaning, ditch cleaning and pond dredging, <br />resulting from the accumulation of said dirt and debris, until all <br />Certificates of Occupancy are issued. <br />6. The Developer shall dedicate to the City, prior to approval of the final plat, <br />at no cost to the City, all permanent or temporary easements necessary for <br />the construction and installation of the Developer Improvements. All such <br />easements required by the City shall be in writing, in recordable form, <br />containing such terms and conditions as the City shall determine. <br />7. The Developer shall be responsible for securing all site grading and <br />development approvals and permits from all appropriate Federal, State, <br />Regional and Local jurisdictions prior to the commencement of site grading <br />or construction. <br />8. The Developer shall make provision that all gas, telephone, cable TV and <br />electric utility designs be submitted to the City for review and approval prior <br />to construction of the streets. Following review and approval by the City, <br />the Developer shall insure that all installations comply with applicable City, <br />County and State design standards and show proof of security arrangements <br />with said utility companies. <br />9. Cost of Developer Improvements and description are as shown on <br />Attachment A. <br />page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.