Laserfiche WebLink
• Contractor: Glenn Rehbein Companies mP Owner. City of Lino Lakes <br />_ LICATION FOR PAYMENT NO. 10 (FINAL, <br />SEH No. A- LINOL0305.03 Location: Lino Lakes, Minnesota <br />8651 Naples Street NE 600 Town Center Parkway <br />Blaine MN 55449 Lino Lakes, MN 55014-1182 <br />Contract for: Legacy at Woods Edge - Phase 1 <br />Contract Date: August 23, 2005 <br />Period Ending: August 14, 2008 Contract Amount 52,231,503.85 <br />No. Item <br />Quantity <br />Unit Est. Qty. to Date Unit Price Total <br />Sanitary Sewer <br />1 Mobilization LS 1 1 537,000.00 537,000.00 <br />2 Remove Existing 12" PVC Sanitary Sewer LF 50 46 $16.00 5736.00 <br />3 Reconstruct Existing Manhole EA 6 6 5361.00 52,166.00 <br />4 - Connect to Existing Sanitary Sewer Manhole EA 2 2 $965.00 51,930.00 <br />5 Connect to Existing Sanitary Sewer EA 1 1 5723.00 5723.00 <br />6 6' PVC Forcemain, C900 CL. 150 LF 310 3 I 0 $2050 56,355.00 <br />7 8" PVC Sanitary Sewer, SDR 35 (0' -10' deep) LF 670 670 518.65 512,495.50 <br />8 r PVC Sanitary Sewer, SDR 35 (10' -15' deep) LF 940 1009 521.00 521,189.00 <br />9 8" PVC Sanitary Sewer, SDR 35 (15' -20' deep) LF 50 50 529.00 51,450.00 <br />10 8' PVC Sanitary Sewer, SDR 26 (20' -25' deep) LF 65 78 $43.00 53,354.00 <br />11 10" PVC Sanitary Sewer, SDR 35 (0 -10' deep) LF 255 255 520.30 $5,17650 <br />12 10" PVC Sanitary Sewer, SDR 35 (10 -15' deep) LF 510 510 522.60 311,526.00 <br />13 10" PVC Sanitary Sewer, SDR 35 (15 -20' deep) LF 225 225 530.60 56,885.00 <br />14 10" PVC Sanitary Sewer, SDR 26 (20 -25' deep) LF 275 275 $45.00 512,375.00 <br />15 Standard Sanitary MH (0-8' deep) EA 14 13 51,880.00 324,440.00 <br />16 Construct MH Over Existing 12" PVC Pipe EA 1 1 52,360.00 $2,360.00 <br />17 Extra Depth Sanitary MH LF 77.4 68.98 5105.00 $7,242.90 <br />18 6" - 45° Bend . EA 2 2 5125.00 5250.00 <br />19 6" PVC Plug EA 1 1 538.00 538.00 <br />20 8" PVC Plug EA 11 12 516.00 5192.00 <br />21 Painting (Manhole) LS 1 I $700.00 5700.00 <br />22 Rock Construction Entrance '1' 50 50 $16.35 5817.50 <br />23 Improved Pipe Foundation Material LF 1250 50.01 <br />AFP Detail <br />Total Sanitary Sewer 5159,401.40 r <br />Page 1 <br />