TABULATION OF BIDS
<br />2011 OVERLAY PROJECT
<br />CITY OF LINO LAKES, MINNESOTA
<br />TKDA PROJECT NO. 14817.002
<br />BIDS OPENED: MARCH 30, 2011, AT 11:30 AM
<br />NORTHWEST ASPHALT, INC T.A.SCHIFSKY & SONS
<br />ITEM UNIT TOTAL UNIT TOTAL
<br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT
<br />GENERAL
<br />1
<br />MOBILIZATION
<br />1
<br />LS
<br />$ 6,800.00
<br />$ 6,800.00
<br />$ 15,000.00
<br />$ 15,000.00
<br />2
<br />TRAFFIC CONTROL
<br />1
<br />LS
<br />$ 1,200.00
<br />$ 1,200.00
<br />$ 3,605.00
<br />$ 3,605.00
<br />3
<br />TOPSOIL BORROW WITH SEED
<br />180
<br />CY
<br />$ 30.00
<br />$ 5,400.00
<br />$ 10.30
<br />$ 1,854.00
<br />4
<br />SODDING
<br />100
<br />SY
<br />$ 4.25
<br />$ 425.00
<br />$ 4.38
<br />$ 438.00
<br />5
<br />EROSION CONTROL BLANKET CATEGORY 3 WITH SEED
<br />600
<br />SY
<br />$ 2.00
<br />$ 1,200.00
<br />$ 2.58
<br />$ 1,548.00
<br />6
<br />SILT FENCE
<br />200
<br />LF
<br />$ 2.75
<br />$ 550.00
<br />$ 3.09
<br />$ 618.00
<br />7
<br />BIODEGRADEABLE FIBER EROSION CONTROL ROLLS
<br />100
<br />LF
<br />$ 3.25
<br />$ 325.00
<br />$ 3.76
<br />$ 376.00
<br />STORM SEWER AND WATER QUAUTY
<br />8
<br />REMOVE 15" CMP CULVERT
<br />100
<br />LF
<br />$ 5.00
<br />$ 500.00
<br />$ 10.30
<br />$ 1,030.00
<br />9
<br />REMOVE 30" RCP CULVERT
<br />60
<br />LF
<br />$ 15.00
<br />$ 900.00
<br />$ 20.60
<br />$ 1,236.00
<br />10
<br />REMOVE AND DISPOSE OF CATCH BASIN
<br />2
<br />EA
<br />$ 400.00
<br />$ 800.00
<br />$ 669.50
<br />$ 1,339.00
<br />11
<br />INSTALL 15" RCP STORM SEWER
<br />100
<br />LF
<br />$ 32.00
<br />$ 3,200.00
<br />$ 36.05
<br />$ 3,605.00
<br />12
<br />INSTALL 15" RCP FES
<br />4
<br />EA
<br />$ 840.00
<br />$ 3,360.00
<br />$ 927.00
<br />$ 3,708.00
<br />13
<br />INSTALL 30" RCP STORM SEWER
<br />60
<br />LF
<br />$ 56.00
<br />$ 3,360.00
<br />$ 113.30
<br />$ 6,798.00
<br />14
<br />INSTALL 30" RCP FES
<br />2
<br />EA
<br />$ 1,600.00
<br />$ 3,200.00
<br />$ 1,442.00
<br />$ 2,884.00
<br />15
<br />CONSTRUCT 4' CURB CUT
<br />4
<br />EA
<br />$ 500.00
<br />$ 2,000.00
<br />$ 257.50
<br />$ 1,030.00
<br />16
<br />CONSTRUCT INFILTRATION DITCH WITH NATIVE SEEDING
<br />250
<br />LF
<br />$ 14.50
<br />$ 3,625.00
<br />$ 22.66
<br />$ 5,665.00
<br />17
<br />REHABILITATE CATCH BASINS
<br />13
<br />EA
<br />$ 2,000.00
<br />$ 26,000.00
<br />$ 566.50
<br />$ 7,364.50
<br />STREET
<br />18
<br />ADJUST GATE VALVE
<br />1
<br />EA
<br />$ 150.00
<br />$ 150.00
<br />$ 293.55
<br />$ 293.55
<br />19
<br />ADJUST MANHOLE
<br />1
<br />EA
<br />$ 380.00
<br />$ 380.00
<br />$ 293.55
<br />$ 293.55
<br />20
<br />RECLAIM BITUMINOUS
<br />19,700
<br />SY
<br />$ 0.64
<br />$ 12,608.00
<br />$ 1.29
<br />$ 25,413.00
<br />21
<br />HAUL OUT EXCESS MILLINGS (LV)
<br />1,000
<br />CY
<br />$ 10.65
<br />$ 10,650.00
<br />$ 8.24
<br />$ 8,240.00
<br />22
<br />RESHAPE MILLINGS (3% CROWN)
<br />58
<br />RS
<br />$ 150.00
<br />$ 8,700.00
<br />$ 149.35
<br />$ 8,662.30
<br />23
<br />SAW CUT BITUMINOUS
<br />300
<br />LF
<br />$ 2.00
<br />$ 600.00
<br />$ 1.55
<br />$ 465.00
<br />24
<br />SAWCUT CONCRETE
<br />75
<br />LF
<br />$ 5.00
<br />$ 375.00
<br />$ 2.58
<br />$ 193.50
<br />25
<br />REMOVE BITUMINOUS DRVEWAY PAVEMENT
<br />180
<br />SY
<br />$ 3.00
<br />$ 540.00
<br />$ 5.15
<br />$ 927.00
<br />26
<br />REMOVE CONCRETE DRIVEWAY PAVEMENT
<br />120
<br />SY
<br />$ 5.00
<br />$ 600.00
<br />$ 5.15
<br />$ 618.00
<br />27
<br />SUBGRADE EXCAVATION
<br />230
<br />CY
<br />$ 12.50
<br />$ 2,875.00
<br />$ 9.79
<br />$ 2,251.70
<br />28
<br />SELECT GRANDULAR BORROW
<br />230
<br />CY
<br />$ 17.50
<br />$ 4,025.00
<br />$ 9.27
<br />$ 2,132.10
<br />29
<br />GEOTEXTILE STABILIZATION FABRIC
<br />500
<br />SY
<br />$ 2.00
<br />$ 1,000.00
<br />$ 4.64
<br />$ 2,320.00
<br />30
<br />AGGREGATE BASE FOR DRIVEWAYS
<br />90
<br />TN
<br />$ 18.00
<br />$ 1,620.00
<br />$ 15.45
<br />$ 1,390.50
<br />31
<br />BITUMINOUS BASE CORSE 2360 (LVNW 35030)
<br />2,330
<br />TN
<br />$ 52.45
<br />$ 122,208.50
<br />$ 62.83
<br />$ 146,393.90
<br />32
<br />BITUMINOUS MATERIAL FOR TACK COAT
<br />990
<br />GAL
<br />$ 3.75
<br />$ 3,712.50
<br />$ 2.58
<br />$ 2,554.20
<br />33
<br />BITUMINOUS WEARING COURSE 2360 (LVWE 45030)
<br />1,760
<br />TN
<br />$ 60.90
<br />$ 107,184.00
<br />$ 62.83
<br />$ 110,580.80
<br />34
<br />BITUMINOUS CURBING
<br />450
<br />LF
<br />$ 9.00
<br />$ 4,050.00
<br />$ 7.00
<br />$ 3,150.00
<br />35
<br />BITUMINOUS DRIVEWAY PAVEMENT
<br />180
<br />SY
<br />$ 22.00
<br />$ 3,960.00
<br />$ 18.54
<br />$ 3,337.20
<br />36
<br />6" CONCRETE DRIVEWAY PAVEMENT
<br />110
<br />SY
<br />$ 56.00
<br />$ 6,160.00
<br />$ 53.05
<br />$ 5,835.50
<br />TOTAL BASE BID
<br />$ 354243.00
<br />$ 383,150.30
<br />Page 3