Laserfiche WebLink
TABULATION OF BIDS <br />2011 OVERLAY PROJECT <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 14817.002 <br />BIDS OPENED: MARCH 30, 2011, AT 11:30 AM <br />NORTHWEST ASPHALT, INC T.A.SCHIFSKY & SONS <br />ITEM UNIT TOTAL UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT <br />GENERAL <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$ 6,800.00 <br />$ 6,800.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />2 <br />TRAFFIC CONTROL <br />1 <br />LS <br />$ 1,200.00 <br />$ 1,200.00 <br />$ 3,605.00 <br />$ 3,605.00 <br />3 <br />TOPSOIL BORROW WITH SEED <br />180 <br />CY <br />$ 30.00 <br />$ 5,400.00 <br />$ 10.30 <br />$ 1,854.00 <br />4 <br />SODDING <br />100 <br />SY <br />$ 4.25 <br />$ 425.00 <br />$ 4.38 <br />$ 438.00 <br />5 <br />EROSION CONTROL BLANKET CATEGORY 3 WITH SEED <br />600 <br />SY <br />$ 2.00 <br />$ 1,200.00 <br />$ 2.58 <br />$ 1,548.00 <br />6 <br />SILT FENCE <br />200 <br />LF <br />$ 2.75 <br />$ 550.00 <br />$ 3.09 <br />$ 618.00 <br />7 <br />BIODEGRADEABLE FIBER EROSION CONTROL ROLLS <br />100 <br />LF <br />$ 3.25 <br />$ 325.00 <br />$ 3.76 <br />$ 376.00 <br />STORM SEWER AND WATER QUAUTY <br />8 <br />REMOVE 15" CMP CULVERT <br />100 <br />LF <br />$ 5.00 <br />$ 500.00 <br />$ 10.30 <br />$ 1,030.00 <br />9 <br />REMOVE 30" RCP CULVERT <br />60 <br />LF <br />$ 15.00 <br />$ 900.00 <br />$ 20.60 <br />$ 1,236.00 <br />10 <br />REMOVE AND DISPOSE OF CATCH BASIN <br />2 <br />EA <br />$ 400.00 <br />$ 800.00 <br />$ 669.50 <br />$ 1,339.00 <br />11 <br />INSTALL 15" RCP STORM SEWER <br />100 <br />LF <br />$ 32.00 <br />$ 3,200.00 <br />$ 36.05 <br />$ 3,605.00 <br />12 <br />INSTALL 15" RCP FES <br />4 <br />EA <br />$ 840.00 <br />$ 3,360.00 <br />$ 927.00 <br />$ 3,708.00 <br />13 <br />INSTALL 30" RCP STORM SEWER <br />60 <br />LF <br />$ 56.00 <br />$ 3,360.00 <br />$ 113.30 <br />$ 6,798.00 <br />14 <br />INSTALL 30" RCP FES <br />2 <br />EA <br />$ 1,600.00 <br />$ 3,200.00 <br />$ 1,442.00 <br />$ 2,884.00 <br />15 <br />CONSTRUCT 4' CURB CUT <br />4 <br />EA <br />$ 500.00 <br />$ 2,000.00 <br />$ 257.50 <br />$ 1,030.00 <br />16 <br />CONSTRUCT INFILTRATION DITCH WITH NATIVE SEEDING <br />250 <br />LF <br />$ 14.50 <br />$ 3,625.00 <br />$ 22.66 <br />$ 5,665.00 <br />17 <br />REHABILITATE CATCH BASINS <br />13 <br />EA <br />$ 2,000.00 <br />$ 26,000.00 <br />$ 566.50 <br />$ 7,364.50 <br />STREET <br />18 <br />ADJUST GATE VALVE <br />1 <br />EA <br />$ 150.00 <br />$ 150.00 <br />$ 293.55 <br />$ 293.55 <br />19 <br />ADJUST MANHOLE <br />1 <br />EA <br />$ 380.00 <br />$ 380.00 <br />$ 293.55 <br />$ 293.55 <br />20 <br />RECLAIM BITUMINOUS <br />19,700 <br />SY <br />$ 0.64 <br />$ 12,608.00 <br />$ 1.29 <br />$ 25,413.00 <br />21 <br />HAUL OUT EXCESS MILLINGS (LV) <br />1,000 <br />CY <br />$ 10.65 <br />$ 10,650.00 <br />$ 8.24 <br />$ 8,240.00 <br />22 <br />RESHAPE MILLINGS (3% CROWN) <br />58 <br />RS <br />$ 150.00 <br />$ 8,700.00 <br />$ 149.35 <br />$ 8,662.30 <br />23 <br />SAW CUT BITUMINOUS <br />300 <br />LF <br />$ 2.00 <br />$ 600.00 <br />$ 1.55 <br />$ 465.00 <br />24 <br />SAWCUT CONCRETE <br />75 <br />LF <br />$ 5.00 <br />$ 375.00 <br />$ 2.58 <br />$ 193.50 <br />25 <br />REMOVE BITUMINOUS DRVEWAY PAVEMENT <br />180 <br />SY <br />$ 3.00 <br />$ 540.00 <br />$ 5.15 <br />$ 927.00 <br />26 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />120 <br />SY <br />$ 5.00 <br />$ 600.00 <br />$ 5.15 <br />$ 618.00 <br />27 <br />SUBGRADE EXCAVATION <br />230 <br />CY <br />$ 12.50 <br />$ 2,875.00 <br />$ 9.79 <br />$ 2,251.70 <br />28 <br />SELECT GRANDULAR BORROW <br />230 <br />CY <br />$ 17.50 <br />$ 4,025.00 <br />$ 9.27 <br />$ 2,132.10 <br />29 <br />GEOTEXTILE STABILIZATION FABRIC <br />500 <br />SY <br />$ 2.00 <br />$ 1,000.00 <br />$ 4.64 <br />$ 2,320.00 <br />30 <br />AGGREGATE BASE FOR DRIVEWAYS <br />90 <br />TN <br />$ 18.00 <br />$ 1,620.00 <br />$ 15.45 <br />$ 1,390.50 <br />31 <br />BITUMINOUS BASE CORSE 2360 (LVNW 35030) <br />2,330 <br />TN <br />$ 52.45 <br />$ 122,208.50 <br />$ 62.83 <br />$ 146,393.90 <br />32 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />990 <br />GAL <br />$ 3.75 <br />$ 3,712.50 <br />$ 2.58 <br />$ 2,554.20 <br />33 <br />BITUMINOUS WEARING COURSE 2360 (LVWE 45030) <br />1,760 <br />TN <br />$ 60.90 <br />$ 107,184.00 <br />$ 62.83 <br />$ 110,580.80 <br />34 <br />BITUMINOUS CURBING <br />450 <br />LF <br />$ 9.00 <br />$ 4,050.00 <br />$ 7.00 <br />$ 3,150.00 <br />35 <br />BITUMINOUS DRIVEWAY PAVEMENT <br />180 <br />SY <br />$ 22.00 <br />$ 3,960.00 <br />$ 18.54 <br />$ 3,337.20 <br />36 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />110 <br />SY <br />$ 56.00 <br />$ 6,160.00 <br />$ 53.05 <br />$ 5,835.50 <br />TOTAL BASE BID <br />$ 354243.00 <br />$ 383,150.30 <br />Page 3 <br />