My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2011-049 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2011
>
2011-049 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2014 11:07:59 AM
Creation date
9/8/2014 1:06:05 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
05/23/2011
Council Meeting Type
Regular
Resolution #
11-49
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• Ordinances: The City will review and update its ordinances to be consistent <br />with the revised Comprehensive Plan. Through ordinance standards and the <br />development review and permitting process, the City is able to implement many <br />of the goals and policies included in the Plan, including the dedication of new <br />parks, open space and trails and protection of natural features, such as <br />wetlands, woodlands, and wildlife and plant habitats. In addition to ordinances <br />protecting natural features, environmental protection within the city may also be <br />supported through the incorporation of green building techniques to reduce the <br />impacts of development and redevelopment. To promote attractive, quality <br />development that enhances the character of Lino Lakes, landscape and design <br />standards will also be reviewed and updated. <br />• <br />Rice Creek Watershed District Lino Lakes Resource Management Plan: <br />As part of the integrated comprehensive planning process, the Rice Creek <br />Watershed District prepared a Resource Management Plan to provide a <br />watershed -based approach to wetland management. This process included an <br />analysis of the city's future land use plan to determine the impacts of future <br />growth on the area's aquatic resources. A key component of the plan is to <br />establish a Wetland Preservation Corridor. This corridor may include high priority <br />wetlands, natural open space (uplands), greenway connections, and marginally <br />suitable development areas. The plan identifies several strategies to mitigate <br />development impacts, particularly within the Wetland Preservation Corridor, as <br />more fully described in Chapter 2: Resource Management System Plan. <br />Infrastructure Capacity <br />In addition to the protection of natural resources, many participants of the Visioning and <br />Comprehensive Plan processes expressed concern about the capacity of the city's infrastructure <br />to accommodate new growth in the community. The availability of infrastructure will also be used <br />to determine the timing and feasibility of new growth. As part of the comprehensive plan, the <br />transportation, water, and sanitary sewer systems were analyzed to determine their capacity to <br />accommodate the 2030 and full build -out growth forecasts. These systems are discussed more <br />fully in Chapters 6, 7 and 8. <br />Land Use and Transportation <br />The city's Land Use Plan was analyzed to determine compatibility with the local transportation <br />system. Based on this analysis, improvements to the transportation system were identified to <br />accommodate additional growth in Lino Lakes. These improvements are discussed in the <br />Transportation Chapter of this plan. Development review will include analysis of the <br />transportation system and transportation improvements may be required as part of the <br />development permitting process. <br />Utility Staging <br />The provision of sewer and municipal water service will be a key factor to determine the timing of <br />future growth. As part of the Comprehensive Plan process, the future land use plan was analyzed <br />to determine future water supply and wastewater infrastructure needs to accommodate new <br />growth. These systems will need to be expanded to accommodate future development in the <br />community. Therefore, a staging plan was developed to identify the sequence and anticipated <br />timing of water and sewer provision (Figure 3 -4). The staging area boundaries are based on the <br />city's sewer districts, current development patterns, and land needed for forecasted development. <br />The staging plan establishes the pattern, timing, and location of future growth to 2030 and <br />beyond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.