Laserfiche WebLink
• <br />TABULATION <br />CLEAR <br />OF BIDS <br />WATER CREEK CROSSING REPLACEMENT <br />ROAD <br />LAKES, MINNESOTA <br />PROJECT NO. 14817.000 <br />OPENED: MAY 17, 2011, AT 10:00 AM <br />*DENOTES ERROR <br />ERROR IN BIDDERS CALCULATION <br />CW HOULE, INC <br />UNIT TOTAL UNIT TOTAL <br />DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT <br />w <br />TKDA <br />SERVICE <br />LINO <br />ENGWEFRV6 •ARCHI;ECTUdE •PLANNING <br />TKDA <br />Th. AO. ... .,h, ,».w.T.. ...v.V, <br />IN BIDDERS CALCULATION <br />UNIT TOTAL <br />PRICE AMOUNT <br />BIDS <br />*DENOTES <br />ITEM <br />NO. <br /># 1 ORNATE BID 1 <br />General <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$ 4,800.00 <br />$ 4,800.00 <br />$ - <br />$ - <br />2 <br />TRAFFIC CONTROL <br />1 <br />LS <br />$ 575.00 <br />$ 575.00 <br />$ - <br />$ - <br />3 <br />TOPSOIL BORROW WITH SEED <br />100 <br />CY <br />$ 18.00 <br />$ 1,800.00 <br />$ - <br />$ - <br />4 <br />EROSION CONTROL BLANKET CATEGORY 3 WITH SEED <br />400 <br />SY <br />$ 4.50 <br />$ 1,800.00 <br />$ - <br />$ - <br />5 <br />SILT FENCE <br />100 <br />LF <br />$ 3.50 <br />$ 350.00 <br />$ - <br />$ - <br />Surface Water Management <br />$ - <br />$ - <br />$ _ <br />1 <br />REMOVE EXISTING 96" CS PIPE <br />92 <br />LF <br />$ 30.00 <br />$ 2,760.00 <br />$ - <br />$ - <br />2 <br />DEWATERING / DIVERSION (SEE DETAIL B) <br />1 <br />LS <br />$ 11,500.00 <br />$ 11,500.00 <br />$ - <br />$ - <br />3 <br />TRENCH STABLIZATION - 1 -1/2 " CRUSHED OR WASHED ROCK (SEE DETAIL A) <br />190 <br />CY <br />$ 42.00 <br />$ 7,980.00 <br />$ - <br />$ - <br />4 <br />INSTALL 96" RCP <br />64 <br />LF <br />$ 763.00 <br />$ 48,832.00 <br />$ - <br />$ - <br />5 <br />INSTALL 96" FES <br />2 <br />EA <br />$ 13,400.00 <br />$ 26,800.00 <br />$ <br />$ - <br />6 <br />RIP RAP CLASS III <br />50 <br />CY <br />$ 98.00 <br />$ 4,900.00 <br />$ - <br />$ - <br />7 <br />GEOTEXTILE FABRIC <br />1,000 <br />SF <br />$ 0.60 <br />$ 600.00 <br />$ - <br />$ - <br />Street <br />$ - <br />$ - <br />$ - <br />1 <br />REMOVE BITUMINOUS <br />180 <br />SY <br />$ 5.00 <br />$ 900.00 <br />$ - <br />$ - <br />2 <br />SAW CUT BITUMINOUS <br />48 <br />LF <br />$ 8.00 <br />$ 384.00 <br />$ - <br />$ - <br />3 <br />REMOVE GUARD RAIL <br />150 <br />LF <br />$ 8.00 <br />$ 1,200.00 <br />$ - <br />$ - <br />4 <br />INSTALL GUARDRAIL <br />150 <br />LF <br />$ 22.00 <br />$ 3,300.00 <br />$ - <br />$ - <br />5 <br />GRANULAR BORROW <br />135 <br />CY <br />$ 22.00 <br />$ 2,970.00 <br />$ - <br />$ - <br />6 <br />5" CLASS 5 AGGREGATE BASE <br />70 <br />TN <br />$ 23.00 <br />$ 1,610.00 <br />$ - <br />$ - <br />7 <br />BITUMINOUS BASE COURSE 2380 (LVNW 35038) <br />50 <br />TN <br />$ 132.00 <br />$ 6,600.00 <br />$ - <br />$ - <br />8 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />15 <br />GAL <br />$ 9.00 <br />$ 135.00 <br />$ - <br />$ - <br />9 <br />BITUMINOUS WEARING COURSE 2360 (LVWE 45030) <br />20 <br />NT <br />$ 152.00 <br />$ 3,040.00 <br />$ - <br />$ - <br />TOTAL <br />$ 132,836.00 <br />$ - <br />$ - <br />Page 2 <br />