Laserfiche WebLink
CHANGE ORDER NO. 1R June 14, 2011 <br />2011 OVERLAY PROJECT <br />ATY OF LINO LAKES, MINNESOTA <br />DA PROJECT NO. 14817.002 <br />ITEM <br />NO. <br />DESCRIPTION <br />UNIT CONTRACT <br />UNIT QUANTITY PRICE AMOUNT <br />1 Bituminous Curb Removal LF 874 $ 3.50 $ 3,059.00 <br />2 Inlet Protection EA 16 $ 150.00 $ 2,400.00 <br />3 Clearing and Grubbing EA 5 $ 250.00 $ 1,250.00 <br />4 Install Catch Basin Structures EA 2 $ 2,950.00 $ 5,900.00 <br />5 Install Castings EA 2 $ 885.00 $ 1,770.00 <br />6 Rip Rap (Class 3) CY 0 $ 300.00 $ <br />7 Remove 30" RCP Culvert LF -60 $ 10.30 $ (618.00) <br />8 Remove and Dispose of Catch Basin EA -2 $ 206.00 $ (412.00) <br />9 Install 30" RCP Storm Sewer LF -60 $ 59.00 $ (3,540.00) <br />10 Install 30" RCP FB EA -2 $ 775.00 $ (1,550.00) <br />11 Remove Subgrade Excavation CY -122 $ 11.00 $ (1,342.00) <br />12 Select Granular Borrow CY -122 $ 15.00 $ (1,830.00) <br />13 Construct 4' Curb Cut EA -4 $ 250.00 $ (1,000.00) <br />14 Construct Infiltration Ditch with Native Seed LF -250 $ 11.00 $ (2,750.00) <br />15 6" Concrete Driveway Pavement SY -50 $ 48.85 $ (2,442.50) <br />$ <br />TOTAL CHANGE ORDER NO. 1R $ (1,105.50) <br />• <br />• <br />