My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2011-071 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2011
>
2011-071 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2014 11:15:05 AM
Creation date
9/8/2014 3:18:47 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
06/27/2011
Council Meeting Type
Regular
Resolution #
11-71
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />AGENDA ITEM 6 I <br />STAFF ORIGINATOR: Jeff Smyser <br />C. C. MEETING DATE: June 27, 2011 <br />TOPIC: Resolution No. 11 -71: Approving Two Agreements With <br />Eagle Brook Church Required for Parking Lot Expansion <br />• Site Improvement Performance Agreement <br />• Operation and Maintenance Agreement for Stormwater <br />Treatment Features <br />ACTION: 3/5 vote <br />BACKGROUND <br />Eagle Brook Church submitted a site plan application for expanding the parking lot on its site at <br />7775 20th Ave. The plan includes expanding the existing parking lot on the south side of the <br />existing building. The parking expansion is not a new idea. It was discussed as being needed in <br />the future for additional seating and included in the analysis conducted for an Environmental <br />Assessment Worksheet. Therefore, the expansion will have no unforeseen environmental <br />impacts. The increase in seating, which would require amending the conditional use permit, is <br />not occurring at this time. <br />Nonetheless, to ensure that all issues are covered at the necessary level of detail, the parking <br />expansion was addressed with a site and building plan review. Site and building plan reviews <br />are conducted administratively in accordance with Section 3, Subd. 6 of the Zoning Ordinance. <br />Staff approval, with conditions, was granted on May 20. The conditions include the preparation <br />of two documents. <br />The City requires a site improvement performance agreement when a project requires a site plan <br />review. This agreement ensures that fundamental work on the site is completed by requiring an <br />escrow deposit. A new site improvement performance agreement has been prepared because the <br />original agreement did not include the new parking expansion. <br />In addition, a maintenance agreement for stormwater facilities often is needed on projects that <br />create new stormwater facilities. Poorly functioning stormwater facilities pose flooding and <br />water quality problems for other properties and water bodies. The parking expansion requires <br />some additional stormwater facilities that were not included in the previous stormwater <br />agreement. <br />We have worked with Eagle Brook Church to prepare the two documents. Resolution No. 11 -71 <br />approves both new documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.