Laserfiche WebLink
M <br />• <br />• <br />I. DESIGNATION OF IMPROVEMENTS. <br />A. Improvements on the project site to be installed at the Developer's <br />expense by the Developer as hereinafter provided are hereinafter referred <br />to as "On -site Work ". <br />B. Improvements off the project site to be installed at the Developer's <br />expense by the Developer as hereinafter provided are hereinafter referred <br />to as "Off -site Work ". <br />C. Developer shall enter into an operation and maintenance agreement for the <br />additional stormwater treatment facilities to be constructed on the site not <br />included in the 2004 plans. <br />II. ON -SITE WORK. <br />A. On -Site Work. The On -Site Work shall consist of the improvements <br />described in the approved Plans, to include any approved subsequent <br />amendments, and shall be in compliance with all applicable statutes, codes <br />and ordinances of the City. The Work includes all on -site exterior <br />amenities as shown on the approved Plans and as required by the plan <br />approval, such as, but not limited to: landscaping, private driveways, <br />parking areas, storm drainage systems, curbing, lighting, site grading, tree <br />preservation work and erosion control measures. <br />Such improvements shall be completed in accordance with Section IV <br />herein. <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On -Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be reviewed <br />by the City, and the City shall establish the actual amount of the financial <br />guarantee based on the estimates, acting reasonably. The description and <br />estimated cost of Developer's On -site Work is as follows: <br />Item <br />Description of Improvements <br />Estimated Cost <br />1 <br />Earthwork/Site Clearing /Erosion Control <br />$ 50,044 <br />2 <br />Sawcut Asphalt <br />$ 1,000 <br />3 <br />Infiltration Basin Soil <br />$ 30,000 <br />4 <br />Site Utilities <br />$ 17,550 <br />5 <br />Asphalt Paving / Class V <br />$ 161,460 <br />6 <br />Striping <br />$ 1,850 <br />7 <br />Curb and Gutter <br />$ 5,852 <br />Eagle Brook Performance Agreement 2011 <br />page 2 of 8 <br />