Laserfiche WebLink
• <br />lanes, sidewalks, trails, site grading, tree preservation work and erosion control <br />measures. <br />Such improvements shall be completed in accordance with Section IV herein. <br />B. Cost Estimates. The Developer shall provide the City with a written estimate of <br />all applicable costs of the On -Site Work, itemized by type; the estimates shall be <br />based upon the actual estimates provided by the contractors who are to do the <br />Work. Said cost estimates shall be reviewed by the City, and the City shall <br />establish the actual amount of the financial guarantee. The description and <br />estimated cost of Developer's On -site Work is as follows: <br />Description of Improvements <br />1. Lighting <br />2. Curbing / Islands / Delineators <br />3. Storm Drainage System / Sewers / Catch Basins / <br />Culverts / Swales <br />4. Driveway/ Curbcut/ Parking Lot/ Fire Lane/ Sidewalks <br />6. Landscaping <br />7. Erosion Control <br />Estimated Costs <br />$5,600 <br />$8,640 <br />$7,425 <br />$40,463 <br />$4,500 <br />$1,100 <br />Total Estimated Cost of Developer Improvements <br />$67,728 <br />Security Requirement (Total * 35 %) <br />$23,705 <br />C. Plans & Specifications. The Developer shall prepare plans and specifications for <br />the making of such improvements. Said plans and specifications shall be subject <br />to review and approval by the City of Lino Lakes. <br />D. Construction Observation. The Developer shall instruct its engineer to provide <br />adequate field inspection personnel to assure an acceptable level of quality control <br />to the extent that the Developer's engineer will be able to certify that the <br />construction work meets the approved City standards as a condition of City <br />acceptance. In addition, the City shall have one or more inspectors inspect the <br />work on a full or part-time basis. <br />The Developer, its contractors and subcontractors, shall follow all reasonable <br />instructions received from the City's inspectors. Prior to construction, the <br />Developer or its engineer shall schedule a preconstruction meeting at a mutually <br />agreeable time at the Lino Lakes City Hall, located at 600 Town Center Parkway, <br />Lino Lakes, Minnesota with contractors, subcontractors, the City staff, and other <br />parties specified by the City to review the program for the construction work. <br />E. Record Plans. Within thirty (30) days after the completion of the improvements <br />the Developer shall supply the City with a complete set of reproducible mylar <br />