My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2005-008 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2005
>
2005-008 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2014 10:50:18 AM
Creation date
9/10/2014 9:46:59 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
01/24/2005
Council Meeting Type
Regular
Resolution #
05-08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />CITY OF LINO LAKES, MINNESOTA <br />RESOLUTION NO.05 -08 <br />SUPPORTING MAIN STREET (CSAH 14) INTERCHANGE AND ROADWAY <br />IMPROVEMENTS <br />WHEREAS, Frenchman Road /145th Street in the City of Hugo, Minnesota is Washington County <br />State Aid Highway 8 (CSAH 8); and <br />WHEREAS, upon entering Anoka County CSAH 8 becomes Anoka County State Aid Highway <br />14 (CSAH 14 /Main Street) providing a direct connection between the cities of Hugo, Lino Lakes, <br />and Centerville, and <br />WHEREAS, this minor arterial roadway provides access to the primary residential, business, <br />commercial, and recreational areas of Hugo, Lino lakes, and Centerville; and <br />WHEREAS, the CSAH 14 /CSAH 8 corridor has an interchange access to Interstate 35E (I -35E), <br />a route on the National Highway System (NHS); and <br />WHEREAS, the CSAH 14/8 corridor will be reconstructed from the I -35E interchange area to <br />Trunk Highway 61 as a four lane divided highway; and <br />WHEREAS, CSAH 14 will be reconstructed from I -35E to CSAH 21 as a four -lane divided <br />highway, and <br />WHEREAS, the current interchange and bridge are insufficient to meet capacity demands <br />today; and <br />WHEREAS, upon completion of the CSAH 14 /CSAH 8 corridor reconstruction the existing <br />bridge will act as a two -lane bottleneck connecting two four -lane divided highways; and <br />WHEREAS, Washington County, in partnership with Anoka County, the City of Hugo, and the <br />City of Lino Lakes have programmed the improvement of CSAH 14 /CSAH 8 corridor east of 1- <br />35E in their 2005 -2009 Capital Improvement Plans; and <br />WHEREAS, Anoka County, in partnership with the Cities of Lino Lakes and Centerville has <br />programmed the improvement of CSAH 14 corridor west of I -35E in their 2005 -2009 Capital <br />Improvement Plan; and <br />WHEREAS, this project is on the I -35E Interregional Corridor, a key roadway defined by the <br />Minnesota Department of Transportation (Mn /DOT) as a roadway that ties the state together by <br />connecting people with jobs, distributors with manufacturers, shoppers with retailers; and <br />tourists with recreational opportunities; and <br />WHEREAS, this project will protect and enhance Interstate mobility, <br />NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO <br />LAKES, MINNESOTA that; the Anoka County Interchange Improvements at I -35E and Anoka <br />County State Aid Highway 14 be authorized as a High Priority Project (HPP) during Re- <br />Authorization of TEA -21, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.