Laserfiche WebLink
COMPENSATING CHANGE ORDER NO. 1 <br />62ND STREET RECONSTRUCTION <br />0 ITYOF LINO LAKES, MINNESOTA <br />A COMMISSION NO. 12510 -02 <br />PERIOD ENDING: January 31, 2005 <br />MN /DOT CONTRACT QUANTITY UNIT AMOUNT NET CONTRACT <br />NO. NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE CHANGE AMOUNT <br />75 2531.501 CONCRETE CURB AND GUTTER DESIGN B418 LF 6,763 6,837.0 $ 7.40 $ 50,593.80 $ 547.60 $ 50,046.20 <br />76 2531.501 CONCRETE CURB AND GUTTER DESIGN 8418 W/O BACK LF 1,150 1,150.0 $ 7.40 $ 8,510.00 $ $ 8,510.00 <br />77 2531.507 6" CONCRETE DRIVEWAY PAVEMENT SY 41 48.8 $ 38.50 $ 1,8713.80 $ 300.30 $ 1,578.50 <br />78 2540.602 INSTALL MAIL BOX SUPPORT EA 9 9.0 $ 75.00 $ 675.00 $ - $ 675.00 <br />79 2540:602 MAIL BOX SUPPORT EA 5 - $ 110.00 $ - $ (550.00) $ 550.00 <br />80 2557.501 BARBED WIRE FENCE LF 420 603.0 $ 2.80 $ 1,688.40 $ 512.40 $ 1,176.00 <br />81 2563.601 TRAFFIC CONTROL LS 1 1.0 $ 2,500.00 $ 2,500.00 $ - $ 2,500.00 <br />82 2564.531 SIGN PANELS TYPE C (INCLUDING POSTS & ASSEMBLY) SF 49 49.0 $ 22.80 $ 1,117.20 $ $ 1,11720 <br />83 2564.536 INSTALL SIGN (INCL. POST & ASSEMBLY) EA 13 13.0 $ 125.00 $ 1,625.00 $ $ 1,625.00 <br />84 2564.603 PVMT MARK. 24" STOP LINE WHITE -POLY PREFORMED LF 64 62.0 $ 22.00 $ 1,364.00 $ (44.00) $ 1,408.00 <br />85 2564.603 PVMT MARK. 4" DOUBLE SOLID LINE YELLOW -PAINT LF 1,966 1,852.0 $ 0.40 $ 740.80 $ (45.60) $ 786.40 <br />86 2564.603 PVMT MARK. 4" SOLID LINE YELLOW-PAINT LF 430 397.0 $ 0.14 $ 55.58 $ (4.62) $ 6020 <br />87 2573.502 SILT FENCE, TYPE PREASSEMBLED LF 8,353 2,650.0 $ 0.01 $ 26.50 $ (57.03) $ 83.53 <br />88 2573.602 INLET PROTECTION EA 12 $ 70.001 $ • $ (840.00) $ 840.00 <br />89 2575.505 SODDING TYPE SALT RESISTANT SY 15,160 13,815.0 $ 3.20 $ 44,208.00 $ (4,304.00) $ 48,512.00 <br />90 2575.604 EROSION CONTROL BLANKET SY 380 1,800.0 $ 2.00 $ 3,600.00 $ 2,840.00 $ 760.00 <br />91 2575.605 SEEDING (INCL. SEED MIX 50B OR 60B, FERTILIZER, MULCH & <br />DISC ANCHORING) ACRE 1.5 3.0 $ 720.00 $ 2,160.00 $ 1,080.00 $ 1,080.00 <br />TOTAL COMPENSATING CHANGE ORDER NO. 1 $ 957,296.85 $ 27,077.47 $ 930,219.38 <br />• <br />• <br />