Laserfiche WebLink
ESTIMATE NO. 7R (FINAL) <br />ELM STREET RECONSTRUCTION <br />CITY OF LINO LAKES, MINNESOTA <br />COMMISSION NO. 12390 -03 <br />ITEM <br />NO. DESCRIPTION <br />PERIOD ENDING: February 14, 2005 <br />CONTRACT QUANTITY UNIT AMOUNT <br />UNIT QUANTITY TO DATE PRICE TO DATE <br />TRAFFIC CONTROL LS 1.0 1.0 $ 300.00 $ 300.00 <br />SILT FENCE TYPE PREASSEMBLED LF 365.0 135.0 $ 2.10 $ 283.50 <br />WOOD FIBER BLANKET TYPE II SY 490.0 - $ 1.25 $ <br />SEEDING (INCL. SEED MIX 50B OR 60B, FERTILIZER, MULCH, AND <br />DISC ANCHORING) ACRE 0.3 0.3 $ 2,000.00 $ 600.00 <br />5 ADD SANITARY SERVICES <br />CONNECT TO EXISTING SANITARY MH EA 1.0 1.00 $ 300.00 $ 300.00 <br />6" PVC (SDR35) SANITARY SEWER LF 120.0 120.00 $ 20.00 $ 2,400.00 <br />6" X 4" PVC WYES EA 2.0 2.00 $ 200.00 $ 400.00 <br />6" PVC CLEAN OUT EA 1.0 1.00 $ 150.00 $ 150.00 <br />6 ADD SUNSET PEDESTRIAN /BIKEWAY TRAIL EXTENSION <br />MOBILIZATION LS 1.0 1.00 $ 1,000.00 $ 1,000.00 <br />COMMON EXCAVATION CY 193.0 193.00 $ 10.51 $ 2,028.43 <br />AGGREGATE BASE, CLASS 5 TON 210.0 210.00 $ 6.80 $ 1,428.00 <br />TYPE LV AGG. 4 WEARING COURSE (B) FOR TRAIL TON 49.0 49.00 $ 39.05 $ 1,913.45 <br />REMOVE C &G LF 8.0 8.00 $ 2.50 $ 20.00 <br />SODDING TYPE SALT RESISTANT SY 1,552.0 1,552.00 $ 1.80 $ 2,793.60 <br />7 ADD FOR ADDITIONAL REMOVAL AND REPLACEMENT OF <br />PEDESTRIAN /BIKEWAY TRAIL <br />REMOVE BITUMINOUS SURFACING SY 895.0 895.00 $ 1.55 $ 1,387.25 <br />COMMON EXCAVATION CY 415.0 415.00 $ 10.51 $ 4,361.65 <br />AGGREGATE BASE, CLASS 5 TON 355.0 355.00 $ 6.80 $ 2,414.00 <br />TYPE LV AGG. 4 WEARING COURSE (B) FOR TRAIL TON 108.0 108.00 $ 39.05 $ 4,217.40 <br />8 ADD LARGER AREA'S SODDING AND SEEDING QUANTITIES. ADD <br />SODDING TYPE SALT RESISTANT (SEEDING REDUCED BY 1.7 <br />ACRES) SY 8,022.0 8,357.0 $ 1.80 $ 15,042.60 <br />9 ADD STORM MANHOLE SUMP SECTION PER RICE CREEK <br />WATERSHED DISTRICT REQUIREMENT. ADD 5' DIA. SUMP MANHOLE <br />SECTION (4' DEPTH). EA 2.0 2.00 $ 700.00 $ 1,400.00 <br />SUBTOTAL CHANGE ORDER NO. 1 $ 204,832.35 <br />CHANGE ORDER NO. 2 <br />1 SAFETY FENCE <br />2 STORM SEWER FABRIC <br />3 HANDSET CURB <br />GRAVEL AT LIVINGSTONS, MOVE WAGON WHEELS, INSTALL NEW <br />4 BLACK UNDER SOD <br />5 REPAIR SENIOR HOUSING POND <br />6 CRABAPPLE TREES <br />7 AMUR CHOKEBERRY <br />8 JAPANESE TREE LILAC <br />9 THORNLESS HAWTHORN <br />10 REPAIR WASHOUTS AT ELM STREET POND <br />11 CRABAPPLE TREES <br />SUBTOTAL CHANGE ORDER NO. 2 <br />TOTAL ESTIMATE NO. 7R (FINAL) <br />1,388.0 1,388.00 $ 1.31 $ <br />12.0 12.00 $ 320.00 $ <br />150.0 150.00 $ 18.90 $ <br />INDICATES CHANGES MADE IN ACCORDANCE WITH C. , 8 ORDER NO. 1 <br />1,818.28 <br />3,840.00 <br />2,835.00 <br />1.0 1.00 $ 2,330.70 $ 2,330.70 <br />1.0 1.00 $ 1,381.50 $ 1,381.50 <br />18.0 18.00 $ 173.00 $ 3,114.00 <br />17.0 17.00 $ 183.00 $ 3,111.00 <br />17.0 17.00 $ 173.00 $ 2,941.00 <br />18.0 18.00 $ 178.00 $ 3,204.00 <br />1.0 1.00 $ 1,132.50 $ 1,132.50 <br />10.0 10.00 $ 173.00 $ 1,730.00 <br />$ 27,437.98. <br />$ 1,420,523.03 <br />Page 3 <br />