My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2005-041 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2005
>
2005-041 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2014 12:38:54 PM
Creation date
9/10/2014 12:19:25 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
03/28/2005
Council Meeting Type
Regular
Resolution #
05-41
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Development Contract <br />Millers Crossroads 2nd Addition <br />March 28, 2005 <br />Tree Preservation Plan. Site activities shall not commence until <br />review of the plan and site has been completed by the City Forester. <br />b) The Developer shall remove, dispose of, or treat all dead and <br />diseased trees in accordance with the City Forester's <br />recommendation before building permits will be issued. <br />4. Grading and Erosion Control Construction & Maintenance <br />a) Prior to the commencement of site grading and erosion control, the <br />Developer shall complete items II.A.1, II.A.2, and II.A.3 as listed <br />above. <br />b) The Developer shall grade the site to within 0.2 foot of the grades <br />shown on the approved Grading plan. No deviations will be allowed <br />unless a revised plan is submitted and approved by the City and all <br />other regulatory agencies. <br />c) All development shall conform to the natural limitations presented <br />by the topography and soil of the subdivision in order to create the <br />best potential for preventing soil erosion. <br />Erosion and siltation control measures shall be coordinated with the <br />different stages of development. Appropriate control measures as <br />required by the City shall be installed prior to development when <br />necessary to control erosion. <br />e) Land shall be developed in increments of workable size such that <br />adequate erosion and siltation controls can be provided as <br />construction progresses. The smallest practical area of land shall be <br />exposed at any one period of time. <br />fl Where the topsoil is removed, sufficient arable soil shall be set aside <br />for respreading over the developed area. The topsoil shall be <br />restored to a depth of at least four (4) inches and shall be of a quality <br />at least equal to the soil quality prior to development. <br />The Developer shall install four (4) inches of topsoil on all <br />boulevards and seed or sod as approved by the City. The Developer <br />shall make all necessary adjustments to the curb stops to bring them <br />flush with the topsoil prior to occupancy. <br />h) All disturbed areas shall be seeded. <br />page 3 <br />- 6 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.