My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2005-053 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2005
>
2005-053 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2014 12:58:57 PM
Creation date
9/11/2014 9:24:12 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
04/11/2005
Council Meeting Type
Regular
Resolution #
05-53
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vaughan Addition <br />Development Contract <br />-2005 <br />The Developer shall grade the site to within 0.2 foot of the grades <br />shown on the approved grading plan. No deviations will be allowed <br />unless a revised plan is submitted and approved by the City and all <br />other regulatory agencies. <br />c) All development shall conform to the natural limitations presented <br />by the topography and soil of the subdivision in order to create the <br />best potential for preventing soil erosion. <br />d) Erosion and siltation control measures shall be coordinated with the <br />different stages of development. The Developer shall attain an <br />NPDES Stormwater Permit prior to engaging in any site grading <br />activities. All terms and conditions of the NPDES permit must be <br />adhered to by the Developer throughout construction the duration of <br />construction of the Subdivision from start to finish. <br />e) Where the topsoil is removed, sufficient arable soil shall be set aside <br />for respreading over the developed area. The topsoil shall be <br />restored to a depth of at least four (4) inches and shall be of a quality <br />at least equal to the soil quality prior to development. The Developer <br />shall make all necessary adjustments to the curb stops to bring them <br />flush with the topsoil prior to occupancy. <br />f) The Developer shall install four (4) inches of topsoil on all <br />boulevards and seed or sod as approved by the City. The Developer <br />shall make all necessary adjustments to the curb stops to bring them <br />flush with the topsoil prior to occupancy. <br />All disturbed areas shall be sodded or seeded, as designated per the <br />approved plans, immediately upon completion of grading . <br />h) All streets shall be protected from erosion deposits. This should <br />include a combination of roadside silt fences, roadside sod strips, <br />catch basin rock bale inlet protection, rock construction entrances, <br />straw mulch, and/or street sweeping. <br />i) No soils shall be imported or exported without City approval. <br />j) All site grading shall be performed in accordance with the <br />requirements of the Rice Creek Watershed District. <br />g) <br />k) Existing wells and on -site septic systems shall be properly <br />abandoned. <br />4. Final access drive and driveway grading, subbase, gravel base, bituminous <br />binder course, and concrete curb and gutter shall be furnished and installed. <br />page 3 <br />- 7 0 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.