Laserfiche WebLink
ESTIMATE NO. 4(FINAL) <br />TWILIGHT ACRES/TWILIGHT ACRES 2ND <br />AilITY OF LINO LAKES, MINNESOTA <br />11" ILITY IMPROVEMENTS <br />NO. 12278 -02 <br />PERIOD ENDING: March 8, 2005 <br />ITEM REVISED <br />NO. DESCRIPTION CONTRACT QUANTITY UNIT AMOUNT <br />TWILIGHT ACRES UNIT QUANTITY TO DATE PRICE TO DATE <br />1 CLEAR & GRUB TREE EA 5.0 <br />2 8" PVC, C900 SANITARY SEWER 3.0 $ 1,000.00 $ 3,000.0 <br />2A 8" PVC, C900 SANITARY SEWER, 0 -10' LF - $ $ <br />2B' 8" PVC, C900 SANITARY SEWER, 10 -12' LF 255.0 - $ 31.8.81 1 $ <br />LF 869.0 919.0 <br />2C 8" PVC, C900 SANITARY SEWER, 12 -14' LF 234.0 42211 4 $ 3.0 $ 32 $ 29,233.3 <br />2.81 $ 13,813.0 <br />2D 8" PVC, C900 SANITARY SEWER, 14 -16' LF 55.0 25.0 $ 34.50 $ 862.5 <br />3 CONSTRUCT 4' DIA. MANHOLE TYPE 301(0 - 10' DEPTH) EA 8.0 8.0 $ 1,650.00 $ 12,090.0 <br />4 EXTRA DEPTH OF 4' DIA. MH <br />LF <br />5 8" DIP OUTSIDE DROP CONNECTION (0 -2') EA 2 1.0 22.0 $ 95.00 $ 2,090.0 <br />6 EXTRA DEPTH 8" DIP OUTSIDE DROP CONNECTION LF 1.5 7.5 $ 2,500.00 $ 2,500.0 <br />L <br />7 4" ON 8" PVC, C -900 WYE BRANCH LF 7.5 7.5 $ 100.00 $ 750.0 <br />8 4" LF <br />PVC, C -900 SAN. SEW. SERVICE PIPE 25.0 25.0 $ 310.00 $ 7,750.0 <br />9 4" RIGID POLYSTYRENE INSULATION LF 770.0 883.0 $ 17.35 $ 15,320.0 <br />10 TRENCH STABILIZATION ROCK SF - $ $ <br />11 TELEVISE SANITARY SEWER MAINS LF 80.0 65.0 $ 5.00 $ 750.0 <br />12 REMOVE CONCRETE DRIVEWAY LF 1,413.0 1,3365.0 $ 0.98 $ 1,337.7 <br />S <br />13 REMOVE BITUMINOUS PAVEMENT SY - $ - $ <br />14 AGGREGATE BASE CLASS 5 SY 4,780.0 4,690.0 $ 5.00 $ 23,450.0 <br />15 2350 TYPE LV 2 OR 3 NON WEAR COURSE TN 560.0 560.00 $ 13.99 $ 7,834.4 <br />16 2350 TYPE LV 4 WEARING COURSE TN - - $ $ - <br />17 CRS -1 BITUMINOUS MATERIAL FOR TACK TN - $ 56.21 $ <br />4 6" CONCRETE DRIVE GA - $ - $ <br />■ 9 SODDING SY <br />- $ - $ <br />20 SILT FENCE SY - - $ 3.89 $ <br />21 COMMON EXCAVATION - STREET LF 60.0 $ 3.00 $ - <br />TOTAL TWILIGHT ACRES CY 360.0 360.0 $ 8.10 $ 2,916.0 <br />$ 124,807.0 <br />TWILIGHT ACRES 2ND <br />1 8" PVC, C900 SANITARY SEWER LF 677.0 688.0 $ 26.31 $ 18,101.2 <br />2 CONSTRUCT 4' DIA. MANHOLE TYPE 301(0 - 10' DEPTH) EA 5.0 <br />3 EXTRA DEPTH OF 4' DIA. MH 5.0 $ 1,695.00 $ 8,652.7 LF 4 8" DIP OUTSIDE DROP CONNECTION (0 -2') EA 1.0 1.0 $ 95.00 $ 612.7 <br />5 EXTRA DEPTH 8" DIP OUTSIDE DROP CONNECTION LF 1.0 7.3 $ 3,285.00 $ 3,980.1 <br />6 .4" ON 8" PVC, C -900 WYE BRANCH EA F 7.3 7.3 $ 310.00 $ 170.0 <br />7 4" PVC, C -900 SAN. SEW. SERVICE PIPE 7.0 7.0 $ 321.45 $ 6,370.6 <br />8 4" RIGID POLYSTYRENE INSULATION SF 238.0 297.0 $ 21.45 $ 6,370.6 <br />9 TELEVISE SANITARY SEWER MAINS SF 3,660.0 3,940.0 $ 1.96 $ 7,722.4 <br />10 REMOVE 24" CMP STORM PIPE LF 677.0 677.0 $ 0.98 $ 663.4 <br />11 REMOVE CATCH BASIN /MANHOLE EA 12.0 8.0 $ 75.00 $ 80.0 <br />12 CURB OPENING CATCH BASIN (MnDOT 4021E) EA 2.0 2.0 $ 375.00 $ 750.0 <br />2.0 2.0 $ 2,550.00 $ 5,100.0 24" CMP STORM SEWER PIPE LF 12.0 8.0 $ 26.35 $ 3210.8 <br />14 CONNECT TO EXISTING STORM SEWER PIPE 50.0 <br />EA <br />15 REMOVE BITUMINOUS PAVEMENT EA 3.0 3.0 $ 450.00 $ 4,860.0 <br />SY 977.0 972.0 $ 5.00 $ 4 <br />16 AGGREGATE BASE CLASS 5 ,860.0 <br />17 2350 TYPE LV 2 OR 3 NON WEAR. COURSE TN 425.0 450.31 $ 28.61 $ 12,883.3 <br />TN - $ - $ <br />18 2350 TYPE LV 4 WEARING COURSE <br />19 CRS -1 BITUMINOUS MATERIAL FOR TACK TN 110.0 183.9 $ 129.05 $ 23,734.8 <br />20 SODDING GA A - $ $ <br />SY <br />•.1 SILT FENCE LF - $ 3.89 $ <br />22 COMMON EXCAVATION - STREET LF 150.0 $ 3.00 $ <br />TOTAL TWILIGHT ACRES 2ND CY $ 8.10 $ <br />$ 97,124.6 <br />ESTIMATE NO. 4 (FINAL) <br />$ 221,931.7 <br />-42- <br />