Laserfiche WebLink
Grading Only-Development Agreement <br /> Apollo Landing <br /> July 25, 2005 <br /> c) All development shall conform to the natural limitations presented <br /> by the topography and soil of the subdivision in order to create the <br /> best potential for preventing soil erosion. <br /> d) Erosion and siltation control measures shall be coordinated with the <br /> different stages of development. Appropriate control measures as <br /> required by the City shall be installed prior to development when <br /> necessary to control erosion. <br /> e) Where the topsoil is removed, sufficient arable soil shall be set aside <br /> for respreading over the developed area. The topsoil shall be <br /> restored to a depth of at least four(4)inches and shall be of a quality <br /> at least equal to the soil quality prior to development. <br /> f) The Developer shall install four(4)inches of topsoil on all <br /> boulevards and seed or sod as approved by the City. The Developer <br /> shall make all necessary adjustments to the curb stops to bring them <br /> flush with the topsoil prior to occupancy. <br /> g) All disturbed areas shall be seeded. <br /> h) The front 50 feet of the lots,the street right-of-way, storm water <br /> storage ponds, and surface water drainage ways shall be graded prior <br /> to commencement of utility construction. <br /> i) Drainage swales,ditches, storm water storage ponds and other high <br /> risk erosion areas shall be protected from erosion. <br /> j) All remaining grading must be completed prior to issuance of <br /> building permits. <br /> k) Protect streets from erosion deposits. This should include a <br /> combination of roadside silt fences,roadside sod strips, catch basin <br /> rock bale inlet protection,rock construction entrances, straw mulch, <br /> and/or street sweeping. <br /> 1) The Developer's engineer shall certify, in writing with an as-built <br /> survey,that all grading complies with the grading plan prior to <br /> issuance of building permits. <br /> 5. Final street grading, subbase, gravel base,bituminous binder course, and <br /> concrete curb and gutter. <br /> 6. Storm sewers when determined to be necessary by the City Engineer, <br /> including all necessary laterals, catch basins,inlets and other appurtenances. <br /> page 4 <br />