Honorable Mayor and City Council <br />City of Lino Lakes, Minnesota <br />Lois Lane Utility and Street Improvements <br />• July 14, 2005 <br />Page 2 <br />• <br />• <br />Each lot would have either a 4 -inch gravity service or a 2 -inch pressure service extended to it. <br />2. Watermain <br />8 -inch watermain would be extended from Hailey Manor westerly approximately 730 feet. Each lot <br />would have a 1 -inch copper service extended to it. Two hydrants would be installed. <br />A watermain sub to the south would be built for future extension. <br />3. Street and Storm Sewer <br />It is recommended installing a standard City street along with the utility improvements. This would <br />be consistent with Hailey Manor. A 32 -foot wide street with surmountable concrete curb and gutter <br />is proposed. <br />Grades would generally match the existing road. <br />As properties are subdivided, they will address impervious surface impacts. <br />Maintenance Impact <br />No unusual maintenance concerns are expected as a result of these improvements. The project would be <br />constructed using the City of Lino Lakes standard drawings for utility construction. <br />Project Cost <br />Enclosed are detailed estimates of the construction costs for the project. The costs are estimated on recent <br />projects in the City of Lino Lakes, and assume installation of the improvements would begin in the spring <br />of 2006. <br />Item Cost <br />Sanitary Sewer- $ 50,570.00 <br />Watermain $ 43,370.00 <br />Streets $ 124,320.00 <br />Subtotal $ 218,260.00 <br />Contingencies (10 %) $ 21,826.00 <br />Subtotal $ 240,086.00 <br />Engineering, Legal and Administration $ 84,914.00 <br />Total Estimated Project Cost $ 325,000.00 <br />Easements <br />