Laserfiche WebLink
• <br />• <br />• control of runoff rate <br />• control of runoff volume <br />• provide 1 -foot contours <br />• break up impervious surfaces <br />• disperse outflow from storm facilities (to create sheet flow, infiltration) <br />• stormwater management area slopes of 6:1 and 10:1 safety bench <br />6. Any approval of a PUD and/or preliminary plat in the area must include a phasing <br />plan based on infrastructure capacities. <br />7. Road improvements to provide adequate capacity for the project must be included as <br />part of the project approval. <br />8. The developer has proposed a conservation development. As provided for in <br />Ordinance No. 24 -04, the developer will be allowed to exceed the stipulated growth <br />limits, provided that the provisions of Section 3 of Ordinance No. 24 -04 are satisfied <br />in conjunction with a planned unit development proposal. <br />Adopted by the Lino Lakes City Council this Al- day of,,,,,,`�'�`� / min , <br />2006. 0 <br />ATTEST: <br />e Bartell, ®'ty lerk <br />Be J. g eso <br />Mayor <br />Adopted by the Lino Lakes City Council this 2- day of <br />, 2006. <br />The motion for the adoption of the foregoing resolution was duly seconded by Council <br />Member 9-4-b14- '' and upon vote being taken thereon, the following <br />voted in favor thereof: <br />ylQ,t a� 1 if 'I 0 D 0,44,4 1 /A-tri e sC i <br />The following voted against same: <br />Whereupon said resolution was declared duly passed and adopted. <br />Resolution 05 -153, page 5 <br />