My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2005-162 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2005
>
2005-162 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 8:26:59 PM
Creation date
9/12/2014 2:06:45 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
10/24/2005
Council Meeting Type
Regular
Resolution #
05-162
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IT IS AGREED BY AND BETWEEN THE PARTIES HERETO: <br /> I. DESIGNATION OF IMPROVEMENTS. <br /> A. Improvements on the project site to be installed at the Developer's <br /> expense by the Developer as hereinafter provided are hereinafter referred <br /> to as"On-site Work". <br /> B. Improvements off the project site to be installed at the Developer's <br /> expense by the Developer as hereinafter provided are hereinafter referred <br /> to as"Off-site Work". <br /> C. Developer shall enter into an operation and maintenance agreement for <br /> stormwater treatment facilities on the site. <br /> II. ON-SITE WORK. <br /> A. On-Site Work. The On-site Work shall consist of the improvements <br /> described in the approved Plans,to include any approved subsequent <br /> amendments, and shall be in compliance with all applicable statutes, codes <br /> and ordinances of the City. The Work includes all on-site exterior <br /> amenities as shown on the approved Plans and as required by the plan <br /> approval, such as, but not limited to: landscaping,private driveways, <br /> parking areas, storm drainage systems, water mains, sanitary sewers, <br /> hydrants, curbing, lighting, fencing, fire lanes, sidewalks,trails, outside <br /> trash disposal enclosures, exterior building architectural design and <br /> building elements, site grading,tree preservation work and erosion control <br /> measures. <br /> Such improvements shall be completed in accordance with Section IV <br /> herein. <br /> B. Cost Estimates. The Developer shall provide the City with a written <br /> estimate of all applicable costs of the On-Site Work, itemized by type; the <br /> estimates shall be based upon the actual estimates provided by the <br /> contractors who are to do the Work. Said cost estimates shall be reviewed <br /> by the City, and the City shall establish the actual amount of the financial <br /> guarantee. The description and estimated cost of Developer's On-site <br /> Work is as follows: <br /> Country Inn and Suites Performance Agreement.doc page 2 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.