Laserfiche WebLink
Legacy Hotel,page 5 <br /> threshold of 300 spaces which would require the implementation of connecting walkways throughout the <br /> •parking lot. <br /> All of the landscaping materials proposed as a part of the planting palette for the site satisfy the comments of <br /> the Environmental Board as well as city staff. <br /> Lighting <br /> The photometric lighting plan submitted with the application is in conformance with the minimum standards of <br /> Chapter 3.7 of the guidelines. Staff has recommended a condition that will coordinate the parking lot lighting <br /> within the entire development and will be included on all of the Legacy at Woods Edge projects. <br /> It is also recommended that the Domus luminaire located near the south entrance drive be moved further west to <br /> better illuminate the drive. A revised lighting plan indicating conformance must be submitted prior to the <br /> issuance of a building permit. <br /> The building itself will include some architectural and building entry lights mounted directly to the building. <br /> These fixtures will be used to highlight the building massing and will enhance the pedestrian environment. <br /> Engineering <br /> The city's consulting engineer on the Legacy project is Short Elliot Hendrickson(S.E.H.), and a memorandum <br /> including all of their comments is attached to the report. Any outstanding issues will be addressed through the <br /> &ite performance agreement and building permit process prior to construction. <br /> Final Plat <br /> The final plat for the project(Village No. 4) is attached to the same agenda as a separate item, and a condition <br /> will be added to this review that the final plat must be approved prior to City Council approval for this building. <br /> ENVIRONMENTAL BOARD <br /> The Environmental Board reviewed this application at the August 3 1"regular meeting. Their comments are <br /> attached and are addressed in the landscaping portion of this report. <br /> PLANNING AND ZONING BOARD <br /> The Planning and Zoning Board reviewed this project at the October 12, 2005 regular meeting, recommending <br /> approval subject to a total of 18 conditions. Revisions to the site plan and elevations have addressed the issues <br /> the Board had about the trash enclosure and the re-siting of the building closer to the right of way. These <br /> revisions are not included with this report but will be included in the Friday update. The developer has raised <br /> concerns in regards to three of the conditions that are being forwarded with the Planning and Zoning Board's <br /> recommendation: <br /> • The developer is encouraged to add an additional architectural element to the central portion of the <br /> • building to further strengthen the presence of the corner. <br />