My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2005-165 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2005
>
2005-165 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2014 2:31:38 PM
Creation date
9/12/2014 2:24:01 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
10/24/2005
Council Meeting Type
Regular
Resolution #
05-165
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABULATION OF BIDS <br />CONSTRUCTION OF WELL PUMPHOUSE NO. 5 <br />CITY OF LINO LAKES, MINNESOTA <br />PROJECT NO. 13089.002 <br />BIDS OPENED: OCTOBER 18, 2005, AT 10:00 AM <br />*DENOTES ERROR IN BIDDERS CALCULATION <br />ENGINEER'S ENCOMM <br />ESTIMATE MIDWEST, INC <br />ITEM TOTAL TOTAL <br />TKDA <br />ENGINEERS • ARCHITECTS • PLANNERS <br />LUND MARTIN MAGNEY <br />CONST INC. CONST. INC <br />TOTAL TOTAL <br />BASE BID PROPOSAL <br />For the complete construction of all work shown on the Contract <br />Drawings and Specifications for Construction of Well Pumphouse <br />No. 5, including, but not limited to, all general, mechanical, process, <br />watermain, electrical, driveway, landscaping, and site work, for the <br />Lump Sum Price of: <br />$ 472,000.00 <br />$ 448,844.00 <br />$ 520,000.00 <br />$ 495,800.00 <br />BASE BID DEDUCT NO. 1 <br />Chlorination equipment by an alternate manufacturer: <br />$ - <br />$ 3,650.00 <br />$ 4,000.00 <br />$ 4,000.00 <br />BASE BID DEDUCT NO. 2 <br />$ 5,000.00 <br />Variable- Frequency Drive (VFD) by an alternate manufacturer: <br />$ - <br />$ 6,350.00 <br />$ 6,500.00 <br />BASE BID DEDUCT NO. 3 <br />• <br />System Integrator by an alternate System Integrator: <br />$ - <br />$ - <br />$ - <br />$ - <br />MEISINGER MEYER RICE LAKE <br />CONST INC. CONTRACTING CONST <br />TOTAL TOTAL TOTAL <br />BASE BID PROPOSAL <br />For the complete construction of all work shown on the Contract <br />Drawings and Specifications for Construction of Well Pumphouse <br />No. 5, including, but not limited to, all general, mechanical, process, <br />watermain, electrical, driveway, landscaping, and site work, for the <br />Lump Sum Price of: <br />$ 482,000.00 <br />$ 456,118.00 <br />$ 480,000.00 <br />BASE BID DEDUCT NO . 1 <br />Chlorination equipment by an alternate manufacturer: <br />$ 5,500.00 <br />$ 4,300.00 <br />$ 5,000.00 <br />BASE BID DEDUCT NO. 2 <br />Variable- Frequency Drive (VFD) by an alternate manufacturer: <br />$ 6,500.00 <br />$ 6,500.00 <br />— <br />BASE BID DEDUCT NO. 3 <br />System Integrator by an alternate System Integrator: <br />$ - <br />$ - <br />$ , - <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.