Laserfiche WebLink
TABUL ON OF BIDS <br />2006 BIRCH STREET TRAIL <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 13633.003 <br />BIDS OPENED: JUNE 20, 2006, AT 10:00 AM <br />*DENOTES ERROR IN BIDDERS CALCULATION <br />ITEM <br />NO. <br />DESCRIPTION <br />TKDA <br />ENGINEERS • ARCHITECTS • PLANNERS <br />MIDWEST ASPHALT CORP HARDRIVES, INC. W.B. MILLER INC. <br />UNIT TOTAL UNIT TOTAL UNIT TOTAL <br />QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT <br />2006 BIRCH STREET TRAIL <br />1 MOBILIZATION <br />2 REMOVE (MILL) BITUMINOUS SURFACING (2' WIDTH) <br />3 REMOVE EXISTING 15" CMP CULVERT <br />4 REMOVE AND REINSTALL SALVAGED SIGNS 4 <br />5 COMMON EXCAVATION (P) 720 <br />6 SUBGRADE EXCAVATION 150 <br />7 SELECT GRANULAR BORROW (CV) 300 <br />8 IMPORTED TOPSOIL BORROW (LV) 665 <br />9 AGGREGATE BASE, CLASS 5 FOR TRAIL /DRIVEWAY (100 °J 1160 <br />10 TYPE LV 4 WEARING COURSE MIXTURE FOR TRAIUDRIVE 260 <br />11 MODULAR BLOCK RETAINING WALL 500 <br />12 15" RC PIPE APRON 2 <br />1 LS $ 12,000.00 $ 12,000.00 $ 11,000.00 $ 11,000.00 $ 7,000.00 $ 7,000.00 <br />250 LF $ 15.00 $ 3,750.00 $ 7.50 $ 1,875.00 $ 4.50 $ 1,125.00 <br />1 LS $ 635.00 $ 635.00 $ 250.00 $ 250.00 $ 550.00 $ 550.00 <br />EA $ 160.00 $ 640.00 $ 200.00 $ 800.00 $ 165.00 $ 660.00 <br />CY $ 20.00 $ 14,400.00 $ 18.50 $ 13,320.00 $ 17.50 $ 12,600.00 <br />CY $ 22.35 $ 3,352.50 i $ 18.50 $ 2,775.00 $ 13.75 $ 2,062.50 <br />CY $ 30.25 $ 9,075.00 $ 24.00 $ 7,200.00 $ 30.00 $ 9,000.00 <br />CY $ 20.15 $ 13,399.75 $ 20.00 $ 13,300.00 $ 5.50 $ 3,657.50 <br />TN $ 18.05 $ 20,938.00 $ 16.50 $ 19,140.00 $ 19.25 $ 22,330.00 <br />TN $ 55.25 $ 14,365.00 $ 81.00 $ 21,060.00 $ 88.00 $ 22,880.00 <br />SF $ 18.65 $ 9,325.00 $ 31.00 $ 15,500.00 $ 27.50 $ 13,750.00 <br />EA $ 1,375.00 $ 2,750.00 $ 1,380.00 $ 2,760.00 $ 1,350.00 $ 2,700.00 <br />1 EA $ 1,800.00 $ 1,800.00 $ 1,450.00 $ 1,450.00 r $ 1,650.00 $ 1,650.00 <br />1 EA $ 500.00 $ 500.00 $ 350.00 $ 350.00 $ 550.00 $ 550.00 <br />12 LF $ 68.55 $ 822.60 $ 45.00 $ 54.0.00 $ 200.00 $ 2,400.00 <br />16 LF $ 77.00 $ 1,232.00 $ 57.00 $ 912.00 $ 187.00 $ 2,992.00 <br />85 LF $ 41.15 $ 3,497.75 $ 38.00 $ 3,230.00 $ 50.00 $ 4,250.00 <br />1 EA $ 4,050.00 $ 4,050.00 $ 1,850.00 $ 1,850.00 $ 5,000.00 $ 5,000.00 <br />1 EA $ 705.00 $ 705.00 $ 450.00 $ 450.00 $ 500.00 $ 500.00 <br />2 EA $ 200.00 $ 400.00 $ 365.00 $ 730.00 $ 220.00 $ 440.00 <br />10 CY $ 116.00 $ 1,160.00 $ 110.00 $ 1,100.00 $ 110.00 $ 1,100.00 <br />510 SF $ 9.15 $ 4,666.50 $ 10.00 $ 5,100.00 $ 5.25 $ 2,677.50 <br />80 SF $ 36.90 $ 2,952.00 $ 50.00 $ 4,000.00 $ 27.50 $ 2,200.00 <br />1 LS $ 685.00 $ 685.00 $ 765.00 $ 765.00 $ 1,75000 $ 1,750.00 <br />50 LF $ 46.60 $ 2,330.00 $ 50.00 $ 2,500.00 $ 44.00 1 $ 2,200.00 <br />1 EA $ 530.00 $ 530.00 $ 1,500.00 $ 1,500.00 $ 1,000.00 $ 1,000.00 <br />1 LS $ 2,100.00 $ 2,100.00 $ 2,000.00 $ 2,000.00 $ 5,000.00 $ 5,000.00 <br />270 SF $ 2.95 $ 796.50 $ 5.55 $ 1,498.50 $ 4.00 $ 1,080.00 <br />1300 LF $ 2.15 $ 2,795.00 $ 2.20 $ 2,860.00 $ 3.25 $ 4,225.00 <br />150 LF $ 4.10 $ 615.00 $ 4.30 $ 645.00 $ 5.50 $ 825.00 <br />6,000.00 SY $ 3.55 $ 21,300.00 $ 2.81 $ 16,860.00 $ 5.50 $ 33,000.00 <br />24.00 LF $ 155.00 $ 3,720.00 $ 800.00 $ 19,200.00 $ 220.00 $ 5,280.00 <br />40.00 LF $ 101.25 $ 4,050.00 $ 45.00 $ 1,800.00 $ 135.00 $ 5,400.00 <br />3.00 EA $ 1,800.00 $ 5,400.00 $ 1,655.00 $ 4,965.00 $ 2,000.00 $ 6,000.00 <br />1.00 LS $ 2,550.00 $ 2,550.00 $ 4,400.00 $ 4,400.00 $ 5,000.00 $ 5,000.00 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />18" RC PIPE APRON <br />18" CS METAL APRON <br />15" RC PIPE SEWER, DESIGN 3006 CLASS V <br />18" RC PIPE SEWER, DESIGN 3006 CLASS V <br />18" CS PIPE SEWER <br />CONSTRUCT MANHOLE, TYPE 403 <br />ADJUST FRAME AND RING CASTING (CB OR MH) <br />ADJUST GATE VALVE BOX <br />RANDOM RIPRAP CLASS III <br />4" CONCRETE WALK (PED RAMPS) <br />TRUNCATED DOME (PED RAMPS) <br />REMOVE AND REINSTALL EXISTING CHAIN LINK FENCE <br />6' CHAIN LINK FENCE <br />FURNISH AND INSTALL REMOVABLE BOLLARD <br />TRAFFIC CONTROL <br />ZEBRA CROSSWALK WHITE, PAINT <br />SILT FENCE, TYPE PREASSEMBLED <br />HAY BALE DITCH CHECK <br />SODDING TYPE SALT RESISTANT <br />TRENCH FRAME W/ GRATED COVER (R- 4996 -A1) <br />4" D.I.P. CLASS 52 (STORM SEWER) <br />CONNECT TO EXIST. 12" RC PIPE <br />BERM GRADING <br />TOTAL <br />$ 173,287.60 $ 187,685.50 $ 192,834.50 <br />Page 2 <br />