My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2006-112 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2006
>
2006-112 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2014 12:42:20 PM
Creation date
9/17/2014 10:25:14 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
07/24/2006
Council Meeting Type
Regular
Resolution #
06-112
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Development Contract <br />Legacy Townhomes (Phase I) <br />July 24, 2006 <br />Certificates of Occupancy are issued. Warning signs shall be placed when <br />hazards develop in streets to prevent the public from traveling on same and <br />directing attention to detours. If and when the streets become impassable, <br />such streets shall be barricaded and closed. The Developer shall maintain a <br />smooth, hard driving surface and adequate drainage on all temporary streets. <br />11. Street Lighting: <br />a) Residential street lighting along public streets shall be owned and <br />operated by the City. Such street lighting system shall be installed, <br />operated, and maintained by the electric utility company. City and <br />electric utility company may enter into a contractual agreement on <br />the rate and maintenance of the street lighting system. Residential <br />street lighting internal to the Subdivision shall be installed by <br />Developer and owned by the homeowners association established to <br />operate and govern the Legacy Townhome development. <br />12. The Developer shall dedicate to the City, prior to approval of the final plat, <br />at no cost to the City, all permanent or temporary easements necessary for <br />the construction and installation of the Developer Improvements. All such <br />easements required by the City shall be in writing, in recordable form, <br />containing such terms and conditions as the City shall determine. <br />13. The Developer shall be responsible for securing all site grading and <br />development approvals and permits from all appropriate Federal, State, <br />Regional and Local jurisdictions prior to the commencement of site grading <br />or construction and prior to the City awarding construction contracts for <br />public utilities. <br />14. The Developer shall make provision that all gas, telephone, cable TV and <br />electric utility designs be submitted to the City for review and approval prior <br />to construction of the streets. Following review and approval by the City, <br />the Developer shall insure that all installations comply with applicable City, <br />County and State design standards and show proof of security arrangements <br />with said utility companies. <br />15. Cost of Developer Improvements and description are as shown on <br />Attachment A. <br />16. Construction of Developer's Improvements: <br />a) The construction, installation, materials and equipment shall be in <br />accordance with the plans and specifications approved by the City. <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.