Laserfiche WebLink
• <br />• <br />• <br />Anoka County Contract No.2006 -0557 <br />11. The City shall pay for one hundred percent (100 %) of the cost of new <br />sidewalk installed on the project including pedestrian curb ramps with truncated domes. The <br />City's estimated cost for new sidewalk is $0.00. <br />12. In place concrete walk will be replaced by the County at no cost to the <br />City. <br />13. The City shall pay one hundred percent (100 %) of the cost of new <br />bituminous trails. This cost includes pavement, aggregate base, soil correction (including <br />lightweight fill and geotextile fabric if applicable) and additional embankment work necessary to <br />construct the trail as well as any retaining walls and fences that are required due to the trail that <br />would not be required without the trail. The City's estimated cost for the trail is $455,496.00. <br />This does not include the non - participating trail cost of $25,122.00 near the CSAH 14 /Rice <br />Creek Bridge. In lieu of paying this cost the City shall contribute the matching amount to the <br />cost of the Bridge construction. <br />14. The City shall pay one hundred percent (100 %) of the cost of any street <br />lighting included in the project. The design and installation of ornamental streetlights shall be in <br />accordance with the County's specifications. The City's estimated cost for street lighting is $ <br />0.00. <br />15. The City shall pay zero percent (0 %) of the cost of construction and <br />installation of the whole traffic actuated signal system at CSAH 54 (including County supplied <br />materials). <br />16. The County shall pay one hundred percent (100 %) of all interconnect <br />costs. <br />17. The City shall pay one hundred percent (100 %) of Emergency Vehicle <br />Pre - emption (EVP) costs. The City's estimated cost for EVP is $0.00. <br />18. The City shall pay their share of mobilization and field office as <br />determined by Mn/DOT. The City's estimated cost of these items is $21,450.00 <br />19. The City shall pay their share of traffic control as determined by Mn/DOT. <br />The City's estimated cost of these items is $2,850.00 <br />20. The City shall pay an estimated $25,122.00 toward the cost of the CSAH <br />14 /Rice Creek Bridge in lieu of paying the non - participating trail cost. <br />21. The total estimated construction cost to the City for the project is <br />summarized below: <br />1 Construction and Adjustment of Local Utilities <br />2 Grading, Base and Bituminous <br />3 Storm Sewer <br />4 Detention Basins (included in Storm Sewer) <br />5 Concrete Curb & Gutter <br />6 Decorative Medians <br />4 <br />$15,800.00 <br />$0.00 <br />$100,789.08 <br />$0.00 <br />$3,933.00 <br />$0.00 <br />