Laserfiche WebLink
.ESTIMA?E NO. 10 (FINAL) <br />HOLLY DRIVE IMPROVEMENTS <br />CITY OF LINO LAKES, MINNESOTA <br />OA PROJECT NO. 12623.002 <br />PERIOD ENDING: July 28, 2006 <br />ITEM MN/DOT CONTRACT QUANTITY UNIT AMOUNT <br />NO. NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE <br />CHANGE ORDER NO. 2 <br />1 CO2 ADD WATERMAIN AND STORM SEWER ADJUSTMENTS: <br />CONSTRUCT WEIR AT 12TH /HOLLY LS 1.0 1.0 $ 1,125.00 $ 1,125.00 <br />ADJUST 96" DIA STRUCTURES AND OUTFALLS LS 1.0 1.0 $ 2,954.50 $ 2,954.50 <br />ADDITIONAL DEPTH 96" DIA STRUCTURES LF 10.3 10.3 $ 324.00 $ 3,337.20 <br />WATERMAIN TIE -IN S. TRAPPERS /MINERAL PT HR 6.0 6.0 $ 450.00 $ 2,700.00 <br />4" DRAIN TILE/CONN TO CB AT CASSIOPEIA CT LS 1.0 1.0 $ 950.00 $ 950.00 <br />SUBTOTAL CHANGE ORDER NO. 2 $ 11,066.70 <br />CHANGE ORDER NO. 3 <br />1 CO3 MOBILIZATION LS 1.0 1.0 $ 1,500.00 $ 1,500.00 <br />2 CO3 SALVAGE AND RE- INSTALL SHRUS/TREES EA 6.0 6.0 $ 60.00 $ 360.00 <br />3 CO3 8" HDPE DRAIN PIPE LF 135.0 135.0 $ 26.00 $ 3,510.00 <br />4 CO3 8" HDPE RISER WITH OPEN GRATE CASTING EA 1.0 1.0 $ 850.00 $ 850.00 <br />5 CO3 CONNECT TO EXISTING DRAIN PIPE EA 1.0 1.0 $ 600.00 $ 600.00 <br />6 CO3 SOD AND RESORATION (INCLUDING TOPSOIL) SY 150.0 150.0 $ 10.00 $ 1,500.00 <br />7 CO3 EROSION CONTROL LS 1.0 1.0 $ 300.00 $ 300.00 <br />SUBTOTAL CHANGE ORDER NO. 3 $ 8,620.00 <br />TOTAL $ 875,314.29 <br />• <br />• <br />