My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2012-011 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2012
>
2012-011 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2014 11:49:34 AM
Creation date
9/23/2014 11:28:25 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
02/13/2012
Council Meeting Type
Regular
Resolution #
12-011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />CITY COUNCIL <br />AGENDA ITEM 6B <br />STAFF ORIGINATOR: Jason C. Wedel, City Engineer <br />MEETING DATE: February 13, 2012 <br />TOPIC: Consider Resolution No. 12 -11 Authorize Execution of Amendment <br />to the Development Contracts for Pine Glen and Pine Glen 2nd <br />Addition <br />VOTE REQUIRED: 3/5 <br />INTRODUCTION <br />On May 22, 2006 and March 12, 2007, the City Council approved the Development Contracts for <br />the Pine Glen and Pine Glen 2nd Additions respectively. Included in the Development Contracts <br />was a provision that the developer establish a cash escrow with the City for the payment of costs <br />incurred by the City related to plat review, administration, engineering review, legal costs, etc. In <br />addition, the developer was also required to provide letters of credit to ensure the improvements <br />that are installed by the developer are in compliance with City requirements. This includes such <br />items as sanitary sewer, watermain, storm sewer and street improvements. <br />BACKGROUND <br />The majority of the developer installed improvements have been complete for several years. The <br />only work remaining is to pave the final lift of bituminous on the streets, which is scheduled to take <br />place this spring. The developer's current of letter of credit is therefore still in place and needs to <br />be renewed for another year. The developer is requested that the City utilize the existing cash <br />escrow as security for the developer installed improvement rather than require the letter of credit be <br />renewed. Renewing the letter of credit cost the developer money and with the housing market <br />continuing to be challenging he would rather not incur the additional cost. <br />The current cash escrow on deposit with the City for both phases of Pine Glen is $85,117.03. A <br />portion of that cash deposit will be needed for City staff time associated with finalizing the project <br />and inspecting the paving of the final lift of bituminous on the streets. Staff is therefore <br />comfortable allowing $65,117.03 to be used as security for the developer installed improvements. <br />The estimated cost to complete the paving is $118,000. The City is therefore requiring the <br />developer to submit an additional $56,500 in cash so that the total cash deposit will be $121,617.03 <br />which is slightly more than the estimate cost to complete the streets. <br />The developer has agreed to provide the additional cash deposit as described above. The only item <br />that still needs to be resolved is amending the existing Development Contracts to allow the cash <br />
The URL can be used to link to this page
Your browser does not support the video tag.