My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2012-030 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2012
>
2012-030 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2014 1:31:47 PM
Creation date
9/23/2014 1:20:21 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
03/26/2012
Council Meeting Type
Regular
Resolution #
12-030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
traveling public and that the Preliminary Layout as shown in Exhibit "A" defines the preliminary design <br />• <br />of the Project. <br />• <br />It is agreed that the Exhibit "A" Layout dated February 2, 2012 has been reviewed and accepted by the <br />parties and is suitable for preparation of final construction documents. Any significant changes made <br />hereafter to the design as presented in the Exhibit "A" Layout will require approval by the parties as an <br />amendment to this JPA. These same changes will require a change in the cost share to include any <br />additional design engineering costs that may occur. <br />IMPROVEMENTS: <br />It is agreed by the parties that in 2012, the intersection of CSAH 34 and Ware Road will be <br />reconstructed to a two -lane section with left and right turn lanes to the extent shown in "Exhibit A ". <br />Improvements include, but are not limited to: new traffic signal construction, right and left -turn lanes, <br />through lanes, shoulders, concrete curb and gutter, storm sewer with associated ponding, and trail. <br />INTERSECTIONS: <br />As agreed by the parties, improvements to the following intersections have been incorporated in the <br />Exhibit "A" Layout design: <br />CSAH 34 / Ware Road: Full Access Intersection with Traffic Signal <br />RIGHT OF WAY: <br />The parties agree that the County will acquire all necessary right -of -way and easements for the Project, <br />and be reimbursed by the City up to $180,000. Acquisition of any additional right -of -way and /or <br />easements needed for improvements to the City street intersections beyond what is defined in the Exhibit <br />"A" Layout will be the responsibility of the City. It is agreed by the parties that all necessary right of <br />way and easements will be in legal possession of the County prior to acceptance of bids for the project. <br />Any City owned property or easements required for the construction will be conveyed to the County at <br />no cost. <br />TRAFFIC SIGNALS: <br />CSAH 34 and Ware Road Intersection: <br />The traffic analysis has determined that a traffic signal is warranted at the CSAH 34 and Ware Road <br />intersection. The parties agree that a traffic control signal system will be constructed at this intersection <br />with this project pending the appropriate approvals. <br />This traffic signal is to be interconnected with the CSAH 34/Hodgson Road traffic signal. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.