My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2012-051 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2012
>
2012-051 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2014 12:40:43 PM
Creation date
9/24/2014 9:21:46 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
06/25/2012
Council Meeting Type
Regular
Resolution #
12-051
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />CITY OF LINO LAKES <br />RESOLUTION NO. 12 -51 <br />AUTHORIZING UTILITY RATE STUDY <br />WHEREAS, the City Council has determined a need to perform a utility rate study to evaluate <br />the financial operations of the Water and Sewer Enterprise Funds; and <br />WHEREAS, the last rate analysis was completed in 2008; and <br />WHEREAS, in February, 2012, the City requested and received a proposal from Springsted, <br />Inc. to conduct a comprehensive utility rate study. The study would include reviewing current and <br />background utility data, including historical financial information, volumes, capital improvements, <br />debt service requirements, policies and practices, growth trends and reviewing engineering studies, <br />including the water conservation plan; and <br />WHEREAS, the proposed study will provide recommendations for the water and sewer user <br />rates, water and sewer trunk area charges, sanitary sewer unit charges, and watermain unit charges; and <br />WHEREAS, in order for Springsted, Inc. to accurately complete the study, we recommend <br />retaining WSB & Associates to prepare the following: <br />o Water Demand /Sewer Flow Population Projections <br />o Water /Sewer Capital Improvement Plan <br />o Replacement, Operations, and Maintenance Plan <br />• NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes, <br />Minnesota, that a Utility Rate Study is hereby authorized to be performed by Springsted, Inc. at a cost <br />of $25,800, plus expenses and WSB & Associates is authorized to perform the above mentioned <br />engineering services at a cost not -to- exceed $16,000. Such cost shall be split equally between the <br />Water and Sewer Funds. <br />Adopted by the Council of the City of Lino Lakes this 25th day of June, 2012. <br />The motion for the adoption of the foregoing resolution was introduced by Council Member <br />0' Donnell and was duly seconded by Council Member Roeser and upon vote being taken <br />thereon, the following voted in favor thereof: <br />O'Donnell, Roeser, Rafferty, Stoesz, Re Allt <br />none <br />The following voted against same: <br />ATTEST: <br />e Bartell, City lerk <br />Jeff R- = ''Mayor <br />
The URL can be used to link to this page
Your browser does not support the video tag.