Laserfiche WebLink
• <br />June 13, 2012 <br />Page 2 <br />Task 2.2: Estimate Consumption /Sewage Generation Trends <br />Estimate consumption/generation trends for residential and commercial /industrial uses and other <br />uses. <br />Task 2.3: Estimate Future Water Demands /Sewage Flows <br />Based on City provided land use and population projections, determine future water <br />demands /sewer flows per year. Future demands /flows are necessary for user rate projections. <br />Task 3 — Water /Sewer Capital Improvement Plan, Funding Options <br />Task 3.1: Prepare Capital Improvement Plans <br />Prepare an annual CIP and 10 -year CIP for the water and sewer systems based on present day <br />values. The CIP will document needed improvements and the timeframe in which they should <br />be completed, along with associated costs. <br />Task 3.2: Recommend Funding Alternatives <br />Using the list of recommended capital improvements and the revised philosophy in Task 1, make <br />general recommendations regarding funding the improvements through various fees (e.g. utility <br />user, trunk, and water /sewer access fees). <br />Task 3.3: Prepare CIP <br />Prepare a draft and final memo summarizing recommended capital improvement plans and <br />funding options <br />Task 4 — Replacement, Operations, and Maintenance Plan <br />Task 4.1: Prepare Estimated Infrastructure Replacement Schedule <br />Prepare an estimated annual replacement budget based on the age and condition of the existing <br />infrastructure. <br />Task 4.2: Prepare Estimated Operations and Maintenance <br />Prepare an estimated annual replacement budget based on the age and condition of the existing <br />infrastructure. For this task, we will need assistance from the City staff to project the annual <br />expenses based on historical expenses. <br />Task 4.3: Recommend Funding Alternatives <br />Using the list of recommended replacements, operations, and maintenance costs and the revised <br />philosophy in Task 1, make general recommendations regarding funding the replacements <br />through various fees (e.g. utility user, trunk, and access fees). <br />City of Lino Lakes Tasks <br />In order to complete our tasks, we will need the City to provide the following: <br />• Provide a designated project contact person. <br />• Provide answers to specific project questions, provide requested information, and make <br />decisions regarding project direction during the course of the project. <br />C: I Usersbl ckdegardn erlAppDotalLocal∎Micros fiIWindowslTempormy Internet F les \Contem.OutlookNMXIVIRSQILTR PROP - 0613/2 -rare study.doc <br />