My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2012-060 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2012
>
2012-060 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2014 12:38:59 PM
Creation date
9/24/2014 10:26:04 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
07/09/2012
Council Meeting Type
Regular
Resolution #
12-060
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />STAFF ORIGINATOR: <br />MEETING DATE: <br />TOPIC: <br />VOTE REQUIRED: <br />INTRODUCTION <br />CITY COUNCIL <br />AGENDA ITEM 6C <br />Michael Grochala <br />July 9, 2012 <br />Consider Resolution No. 12 -60, Authorizing <br />Preparation of Plans & Specifications, 2012 Surface <br />Water Management Project <br />Simple Majority <br />Staff is requesting council action to authorize preparation of plans and specification for the 2012 <br />Surface Water Management Project. WSB, city engineer, has submitted a proposal for the not to <br />exceed amount of $15,000 to prepare the plans, provide contract administration and construction <br />inspections. Funding for the engineering and the maintenance contract is included in the 2012 <br />Public Services — Streets budget. <br />BACKGROUND <br />The City operates a storm water conveyance system to manage water runoff and water quality <br />from City streets and neighborhoods. To maintain the effectiveness of the system, cleaning and <br />repair of pipe sections, catch basins, manholes, drainage ways and ponds must be completed. <br />City staff conducts's annual reviews of the system components as required by the City's National <br />Pollutant Discharge Elimination System (NPDES) permit. Project priorities are determined <br />following completion of the inspection process and evaluation of resident issues identified <br />during the year. <br />RECOMMENDATION <br />Staff is recommending approval of Resolution No. 12 -60 Authorizing Preparation of Plans and <br />Specifications. <br />ATTACHMENTS <br />1. Resolution No. 12 -60 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.