Laserfiche WebLink
Resolution 12-68 <br /> Page 3 <br /> Monitoring of the activity by the City will ensure this work will not <br /> become detrimental. <br /> I. Will not result in the destruction, loss, or damage of a natural, scenic or <br /> historic feature of major importance. <br /> City staff and the appropriate agencies have reviewed the site to confirm <br /> no deterioration of the site will occur. <br /> WHEREAS, the City Council of the City of Lino Lakes finds that, with the conditions of <br /> approval included in this resolution, the following findings of fact apply as required by <br /> section 3 Subdivision 11 of the Lino Lakes Zoning Ordinance. <br /> 1. Properly fence any pit or excavation, and barricade entrances to prevent <br /> the general public from depositing garbage or refuse. <br /> 2. Slope the banks, and otherwise guard and keep any pit or excavation in <br /> such condition as not to be dangerous because of sliding or caving banks. <br /> 3. Properly drain, fill, or level off any pit or excavation so as to make the <br /> same safe and healthful as the permitting authority may determine. <br /> 4. Limit the depth of such excavation to an elevation no lower than the <br /> minimum floor elevation for building construction as established by the <br /> City Engineer, so as not to diminish development potential of the parcel. <br /> 5. Limit any fill material to clean fill, defined as rock, sand, gravel, clay, or <br /> other like and similar non-decomposable material. Concrete, asphalt, <br /> metal, wood, and other debris shall be prohibited. <br /> 6. Require that all decomposable material, or other unsuitable foundation <br /> material, be removed from an area before deposition of fill begins. <br /> 7. Prepare-a-siteplan showing existing and proposed grade elevations and <br /> effect of storm water drainage on adjacent areas. <br /> 8. Specify a time when the excavation or land reclamation project shall be <br /> completed. <br /> 9. Place a minimum of four (4) inches of top soil over the completed project <br /> and establish appropriate ground cover within sixty (60) days of <br /> completion, or in a time period consistent with the City's storm water <br /> management and pollution prevention plan. <br /> 10. Reimburse the City for the cost of periodic inspections by the City for the <br /> purpose of determining that the terms under which the permit has been <br /> 10 issued are being complied with. <br />