My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2012-096 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2012
>
2012-096 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2014 4:42:50 PM
Creation date
9/24/2014 12:36:53 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
09/10/2012
Council Meeting Type
Regular
Resolution #
12-096
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />The Permittee will: <br />a. Obtain certified as -built contours for all ponds and inspect the ponds, <br />and associated outlet structures, culverts and outfall structures one year <br />and two years after the completion of as- builts, including measuring <br />sediment accumulation by a method accurate to within one vertical foot. <br />Thereafter, the Permittee will perform inspections in the fifth year after <br />pond completion and every five years thereafter. If inspections show that <br />sediment may accumulate to 50 percent of wet storage volume, or 25 <br />percent of dry detention volume, within less than five years, the Permittee <br />will inspect more frequently. Pond function will be considered <br />inadequate if sediment accumulation has decreased the wet storage <br />volume by 50 percent or dry detention volume by 25 percent, and the <br />Permittee will restore the basin to its original design elevations and <br />dimensions and restore vegetation in disturbed areas within one year of <br />the inspection date. <br />b. Inspect stormwater infiltration and filtration basins, including rain <br />gardens, annually, to preserve live storage capacity at or above the <br />design volume. Remove vegetation, maintain healthy plant growth and <br />remove excess sediment and debris to ensure that the facilities continue <br />to perform per design. <br />d. Inspect conveyances and other structures annually. Ensure <br />preservation of designed hydraulic capacity. <br />2. If the Permittee conveys into private ownership a fee interest in all or any <br />portion of the public property that is subject to this Agreement, it must require <br />as a condition of sale, and enforce: (a) that the purchaser record a declaration <br />on the property incorporating the stormwater management facility maintenance <br />requirements of this Agreement; and (b) that recordation occur either before any <br />encumbrance is recorded on the property or, if after, only as accompanied by a <br />subordination and consent executed by the encumbrance holder ensuring that <br />the declaration will run with the land in perpetuity. If the Permittee conveys into <br />public ownership a fee interest in all or any portion of the property that is <br />subject to this Agreement, it must require as a condition of the purchase and <br />
The URL can be used to link to this page
Your browser does not support the video tag.