My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2012-130 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2012
>
2012-130 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2021 1:08:55 PM
Creation date
9/25/2014 10:44:41 AM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
12/10/2012
Council Meeting Type
Regular
Resolution #
12-130
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ t <br /> \ \ LEGEND <br /> ;/o PROPOSED EXISTING <br /> (\ <br /> CURB&GUTTER <br /> /711 STORM SEWER <br /> DRAINTILE acintra <br /> CONTOUR —902— --9D2— en0lneeringstin IRO plae0lflp f1118TQy <br /> RIP RAP �EOF 148M 28M ft N.8�140 <br /> ' OVERFLOW ELEV. <br /> � lymDNh Nlnnesa0a 55447 <br /> SILT FENCE ---- <br /> SF-- p <br /> -- 1763)476.6010 <br /> SILT DIKE --e-Sp--- gliMplim <br /> LIMITS OF DISTURBANCE 1763)476.8632 IBGSIIIIIIE <br /> SOIL BORINGS S T-9 PA-10 wNw.mftmm <br /> DIRECTION OF <br /> 76 I OVERLAND FLOW Client <br /> TEMPORARY DIVERSION <br /> I DITCH <br /> CHECK DAM Fermler <br /> q; <br /> ND ucuRB LIMITS OF DRAINAGEPatterism <br /> / ,' / EI(�E®!e` - •` BIO-ROLL ® P. CONSTRUCTION <br /> INLET PROTECTION DEVICE i Q rv-I <br /> g8 <br /> INLET PROTECTION DEVICE 2 ®P-2 <br /> - t \Ir, \ � \\ � TEMPORARY STONE <br /> CONSTRUCTION ENTRANCE Project <br /> / ^^^)�1J 917 ` '� \ TEMPORARY SEDIMENT BASIN )B <br /> BILL'S <br /> �ls V 1.1 OR ORE I /�� __ E <br /> s / / —� TEMPORARY STORAGE AND PARKING AREA TS 1 ,362 SF SUPERETTE <br /> e / _ <br /> 915._ ^� FFE=917.60 '— — - TEMPORARY STABILIZATION MEASURES <br /> SF `� \ m \t `� (SEED,MULCH,MATS OR BLANKETS AS SM <br /> � OUTLINED IN THE SWPPP) <br /> 1 SUMMONED SEQUENCE OF CONSTRUCTION <br /> PHASE I: <br /> 1 INSTALL STABILIZED CONSTRUCTION ENTRANCES. <br /> 2. PREPARE TEMPORARY PARKING AND STORAGE AREA <br /> g <br /> LAKES, <br /> n <br /> 3. CONSTRUCT THESILTEDIFENCESSEDIMENTATION <br /> LINOLocatiOLJ'1KE MN <br /> 4. CONSTRUCT THE SEDIMEMA710N AND SEDIMENT TRAP BASINS. <br /> ` S. HALT ALL ACTIVITIES AND CONTACT THE CMLENGINEERING CONSULTANT TO PERFORM S/ <br /> r - \ 1 K INSPECTION OF BMPs.GENERAL CONTRACTOR SHALL SCHEDULE AND CONDUCT STORM WATER <br /> PRE-CONSTRUCTION MEETING WITH ENGINEER AND ALL GROUND DISTURBING CONTRACTORS <br /> BEFORE PROCEEDING WITH CONSTRUCTION. <br /> it \ \\ a.ao 915 , 6. CLEAR AND GRUB THE SITE. <br /> h. ems, ` 4 7. BEGIN GRADING THE SITE. <br /> �� R-,� T' j \ \ 8. START CONSTRUCTION OFBUILDING PAD AND STRUCTURES. <br /> PHASE II: <br /> ,• `/ / //j/ °j / L I 1. TEMPORARILY SEED DENUDED AREAS. <br /> 2. INSTALL UTILITIES,UNDERDRAINS,STORM SEWERS,CURBS AND GUTTERS. <br /> �• `L- / / — ---- a 3. INSTALL RIP RAP AROUND OUTLET STRUCTURES. <br /> Certification <br /> Q 4. INSTALL INLET PROTECTION AROUND ALL SEWER STRUCTURES. <br /> YYY 5. PREPARE SITE FOR PAVING (hereby certify,the this Pian,sceelfication or <br /> IGAS STATION 6. PAVE SITE. report Was prepared me or under my direct <br /> 7 173,' '� 8,087 SF x I1 I 4 7. INSTALL INLET PROTECTION DEVICES supervision EN I a that am a duly licensed <br /> -GAS PUMP' FF€ 5.90 I I I� I I \ 8. COMPLETE GRADING AND INSTALL PERMANENT SEEDING AND PLANTING. vo ofessional ENGINEER under the I-of lies state <br /> NDP - 9. REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES(ONLY IF SITE IS <br /> _ — , IB CURB <br /> /• STABILIZED),IF REQUIRED BY THE CONTRACT <br /> NOTE TO CONTRACTOR Mlcnael C.B a t <br /> Re istration-No:42661 Dare:11 19 2012 <br /> THE EROSION CONTROL PLAN SHEETS ALONG WITH THE REST-OF THE SWPPP MUST BE KEPT B / / <br /> _ - ONSITE UNTILTHE NOTICE OFTERMINATION IS FILED WITH THE MPCA,THE CONTRACTOR MUST- Ifapdualoe,00manusior.wetsoneacow ofthis <br /> t , /� UPDATETHESWPPP,INCLUDING THE EROSION CONTROL PLAN SHEETS AS NECESSARY TO INCLUDE planW ichi,va bleuponrecuesut MFRAInc, <br /> ' _ $ _ ADDITIONAL REQUIREMENTS,SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT Vlymuutl,,MNoffioe. <br /> _ —— q- PROBLEMS IDENTIFIED.AFTER FILING THE NOTICE OF TERMINATION,THE SWPPP,INCLUDINGTHE <br /> EROSION CONTROL PLAN SHEETS,AND ALL REVISIONS TO IT MUST BE SUBMITTED TO THE OWNER, Summary <br /> -� ma..aa <br /> TO BE KEPT ON FILE IN ACCORDANCE WTTHTHE RECORD RETENTION REQUIREMENTS DESCRIBED S T r <br /> / -� _33 SWPPP NARRATIVE <br /> / Designed:MCB Dr ffA <br /> IN THE <br /> ,4+!�� --------�-+--1 ———-- ti9 \ 1 ter'-/ `i Phase:PApprwed:mat Boo IIssue:7271szau <br /> REum <br /> initi <br /> - -- I I AREA SUMMARY IN ACRES- <br /> Revision HIStOr�/ <br /> 1•'�", 1 li `/�\ \' �` PAVEMENTAREA 2.56 AC No.Date By Submittal/Revision <br /> 912 DB6 CURB A 09/3D/12 SEG WATERk1ED CDMMFNIS <br /> $ I I f -, / \ y\\ t BUILDING AREA 0.49 ACt B t01B/u nA Cm mMMa EN <br /> /\) \ Tom--dS--- <br /> ENtS <br /> i` .� I_``_ J -- - - -- -- - -219- inA -- - \! SEEDED AREA 0.72 ACt D 1Lo u /FA CU—C—ENIS M <br /> POND AREA 0.38 AC3 <br /> '� R.O.W.DISTURBED 0.55 AC3 <br /> 911 TOTAL DISTURBED 5.02 AC3 <br /> — — - —_ PRE-CONSTRUCTION IMPERVIOUS 0.02 AC3 <br /> I ` <br /> MAIN STREET POST-CONSTRUCTION IMPERVIOUS 3.20 AC; <br /> $ a \ <br /> — \ ——,- — _— ;" -! 'REFER TO SHEET C5.03 FOR GENERAL NOTES,MAINTENANCE <br /> . <br /> NOTES,LOCATION MAPS,AND STANDARD DETAILS <br /> INEEMENNOSOIL EROSION/SEDIMENTATION CONTROL OPERATION TIME SCHEDULE Sheet Title <br /> CONSTRUCTION SEQUENCE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN - EROSION CONTROL MATERIALS EROSION AND <br /> TEMPORARY CONTROL MEASURES <br /> STRIP&STOCKPILETOPSOIL QUANTITIES SEDIMENT <br /> ITEM UNIT I QUANTITY <br /> ROUGH GRADE/SEDIMENT CONTROL <br /> TEMPORARY CONSTRUCTION ROADS SILT FENCE LINEAR FEET 2800 CONTROL PLAN <br /> • FOUNDATION/BUILDING CONSTRUCTION - SILT DIKE LINEAR FEET D <br /> SITE CONSTRUCTION BIO-ROLL LINEAR FEET 600 PHASE II <br /> SITE CONSTRUCTION <br /> N STRUCTURES CONSTRUCTION ENTRANCE UNIT 1 <br /> PERM NENTCGRADING INLET PROTECTION DEVICEIIP-1) UNIT 0 Sheet No. Revision <br /> FINISLANDSCAPING/SEED/FINAL STAB INLET PROTECTION DEVICE)IP-2) UNIT 2 C5.02 D <br /> (t <br /> STORM FACILITIES <br /> NORTH <br /> 0 40 80 <br /> NOT E:CONTCTORORGENERALCONTRACTORTOCOMPLETETABLEWITHTHEIRSPECIFICPROJECTSCHEDULE SCALE IN FEET ProjeCtNo. FEN19355 <br /> RA <br />
The URL can be used to link to this page
Your browser does not support the video tag.