Laserfiche WebLink
2012 STORMWATER MAINTENANCE PROJECTS <br />CITY OF LINO LAKES PROJECT NO. 12-03 <br />WSB PROJECT NO. 2029-25 <br />CHANGE ORDER NO. 1 DETAIL <br />NOVEMBER 29, 2012 <br />ADDED ITEMS <br />Item No. Mat. No. Description <br />Qty Unit Price Extended Amount <br />73 2105.607 POND EXCAVATION 42 CU YD $21.00 $882.00 <br />74 2575.501 SEEDING (INCL TOPSOIL & FERTILIZER) 0.2 ACRE $4,000.00 $800.00 <br />75 2575.502 SEED MIXTURE 260 40 POUND $5.00 $200.00 <br />76 2575.523 EROSION CONTROL BLANKETS CATEGORY 3 1100 SQ YD $4.00 $4,400.00 <br />77 2575.523 EROSION CONTROL BLANKETS CATEGORY 3 80 SQ YD $15.00 $1,200.00 <br />78 2104.505 REMOVE BITUMINOUS PAVEMENT 5 SQ YD $10.00 $50.00 <br />79 2550.604 PATCH 5 SQ YD $69.00 $345.00 <br />80 2575.523 EROSION CONTROL BLANKETS CATEGORY 3 50 SQ YD $50.00 $2,500.00 <br />81 2503.541 15" RC PIPE SEWER DESIGN 3006 CLASS V 8 LIN FT $53.00 $424.00 <br />82 2575.505 SODDING, TYPE LAWN (INCL TOPSOIL & FERT) 40 SQ YD $11.00 $440.00 <br />TOTAL ADDED ITEMS CHANGE ORDER NO. 1 $11,241.00 <br />DELETED ITEMS <br />Item No. Mat. No. Description <br />Qty Unit Price Extended Amount <br />83 2575.523 EROSION CONTROL BLANKETS CATEGORY 3 50 SQ YD $6.00 $300.00 <br />84 2501.511 18" RC PIPE CULVERT CLASS III 6 LIN FT $57.00 $342.00 <br />85 2575.502 SEED MIXTURE 260 20 POUND $5.00 $100.00 <br />86 2575.501 SEEDING (INCL TOPSOIL & FERTILIZER) 0.1 ACRE $4,000.00 $400.00 <br />87 2575.523 EROSION CONTROL BLANKETS CATEGORY 3 50 SQ YD $11.00 $550.00 <br />TOTAL DELETED ITEMS CHANGE ORDER NO. 1 $1,692.00 <br />TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $9,549.00 <br />K 102029.2501AdmintConstruction Admini <br />Page 2 2029.25 Change Order 1-112912C0 1 Detail <br />