My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-22-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
09-22-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2015 1:54:01 PM
Creation date
9/25/2014 2:12:31 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/22/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NorthPointe 2nd Addition <br />Development Contract <br />September, 2014 <br />c. The Developer Plans shall be approved by the City. The Developer shall secure a <br />contractor to install these improvements, which contractor shall be approved by <br />the City in its absolute discretion. All Developer Improvements shall require City <br />inspection and approval and, where appropriate, the approval of any other <br />governmental agency having jurisdiction. The Developer shall construct and <br />install at the Developer's expense the following improvements according to the <br />following terms and conditions: <br />i. Grading and Erosion Control shall be completed by the developer prior to <br />the construction of the Subdivision. <br />ii. All homeowners association declarations, covenants, and property and <br />legal requirements as required in the Agreement shall be submitted to the <br />City Attorney for review as required by the City's final plat requirements. <br />iii. The Developer shall place iron monuments at all lot and block corners and <br />at all other angle points on boundary lines. Iron monuments shall be <br />placed after all street and lawn grading has been completed in order to <br />preserve the lot markers for future property owners. Lot corner irons on <br />the back property line shall be installed so that the top of the iron <br />corresponds to the finished ground elevation in accordance with the <br />approved grading plan. Guard stakes shall be appropriately installed to <br />mark these irons. <br />iv. The Developer shall promptly clear dirt and debris within public right-of- <br />ways and drainage and utility easements resulting from construction by the <br />Developer, its purchasers, builders and contractors within five (5) days <br />after notification by the City. The Developer or its assigns shall be <br />responsible for all necessary street and storm sewer maintenance, <br />including street sweeping, prior to issuance of any Certificates of <br />Occupancy. Warning signs shall be placed when hazards develop in <br />streets to prevent the public from traveling on same and directing attention <br />to detours. If and when the streets become impassable, such streets shall <br />be barricaded and closed. The Developer shall maintain a smooth, hard <br />driving surface and adequate drainage on all temporary streets. <br />v. Street Lighting: <br />1. Residential street lighting shall be owned by the City. Such street <br />lighting system shall be installed, operated, and maintained by the <br />electric company. City and electric utility company may enter into <br />a contractual agreement on the rate and maintenance of the street <br />lighting system. City shall use escrow funds to pay for street light <br />installation. <br />page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.