My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-22-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
09-22-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2015 1:54:01 PM
Creation date
9/25/2014 2:12:31 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/22/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NorthPointe 2nd Addition <br />Development Contract <br />September, 2014 <br />vi. Publications <br />vii. Street Lighting — Installation Escrow <br />viii. Traffic Signing Improvements <br />ix. Boulevard Tree Planting <br />x. Street - Storm Sewer - Pond Maintenance <br />b. If the above escrow amounts are insufficient, the Developer shall make such <br />additional deposits as required by the City. The City shall have a right to <br />reimburse itself from the Escrow upon notice to the Developer, with suitable <br />documentation supporting charge. <br />c. The Developer agrees to pay the following fees related to the development of the <br />Subdivision and the Developer Improvements including, but not limited to, the <br />following (See Attachment C for breakdown of costs): <br />i. Park Dedication <br />ii. Street Lighting -Operation <br />iii. Sealcoating <br />iv. Aerial Photo <br />d. The Developer has requested a Petition and Waiver Agreement per Minnesota <br />Statute 429 for road and utility improvements to Cedar Street from 20th Avenue to <br />the eastern edge of Outlot C, 21st Street S. and Palm Street. These road and utility <br />improvements shall be completed with Phase II of the Development and shall be <br />assessed to the benefitting properties within Phase II. Cedar Street is to be <br />constructed as a 24 foot wide, rural bituminous roadway within the existing right <br />of way. 21st Street S. and Palm Street shall be constructed to approved plans and <br />specifications. <br />V. TRUNK UTILITY & SURFACE WATER MANAGEMENT CHARGES <br />a. Trunk Sewer Unit Charges. <br />i. The City established trunk unit charges to uniformly distribute the costs of <br />public trunk sanitary sewer infrastructure. Each individual connection to <br />the sanitary sewer system shall be charged a unit charge per SAC unit <br />(currently at $2,975 per SAC unit). The unit charge shall be based on the <br />procedure outlined in the Metropolitan Environmental Services Service <br />Availability Charge Procedure Manual. Trunk sewer unit charges <br />page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.