Laserfiche WebLink
COMPENSATING CHANGE ORDER NO. 2 PERIOD ENDING: January 2, 2013 <br />OTTER LAKE SERVICE ROAD CULVERT REPLACEMENT <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 14817.003 <br />ITEM <br />NO. DESCRIPTION <br />GENERAL <br />1 MOBILIZATION <br />2 TRAFFIC CONTROL <br />3 TOPSOIL BORROW WITH SEED <br />4 EROSION CONTROL BLANKET CATEGORY 3 WITH SEED <br />5 SILT FIENCE <br />CONTRACT QUANTITY UNIT <br />UNIT QUANTITY TO DATE PRICE <br />AMOUNT NET <br />TO DATE CHANGE <br />1.0 1.0 $ 1,500.00 $ 1,500.00 $ <br />1.0 1.0 $ 300.00 $ 300.00 $ <br />100.0 - $ 0.50 $ - $ <br />400.0 560.0 $ 6.00 $ 3,360.00 $ <br />100.0 - $ 3.00 $ - $ <br />- $ <br />$ <br />(50.00) $ <br />960.00 $ <br />(300.00) $ <br />CONTRACT <br />AMOUNT <br />1,500.00 <br />300.00 <br />50.00 <br />2,400.00 <br />300.00 <br />SUBTOTAL - GENERAL <br />SURFACE WATER MANAGEMENT <br />1 REMOVE EXISTING 96" CS PIPE <br />2 DEWATERING / DIVERSION (SEE DETAIL B) <br />3 TRENCH STABILIZATION -1 1/2" CRISHED OR WASHED ROCK <br />(SEE DETAIL A) <br />4 INSTALL 96" RCP <br />5 INSTALL 96" FES <br />6 RIP RAP CLASS III <br />7 GEOOTEXTILE FABRIC <br />SUBTOTAL - SURFACE WATER MANAGEMENT <br />STREET <br />1 REMOVE BITUMINOUS <br />2 SAW CUT BITUMINOUS <br />3 REMOVE GUARD RAIL <br />4 INSTALL GUARD RAIL <br />5 GRANULAR BORROW <br />6 5" CLASS 5 AGGREGATE BASE <br />7 BITUMINOUS BASE COURSE 2380 (LVNW 35038) <br />8 BITUMINOUS MATERIAL FOR TACK COAT <br />9 BITUMINOUS WEARING COURSE 2360 (LVWE 45030) <br />92.0 <br />1.0 <br />190.0 <br />64.0 <br />2.0 <br />50.0 <br />1,000.0 <br />92.0 $ <br />1.0 $ <br />194.0 $ <br />64.0 $ <br />2.0 $ <br />46.0 $ <br />1,000.0 $ <br />180.0 180.0 $ <br />48.0 48.0 $ <br />150.0 150.0 $ <br />150.0 75.0 $ <br />135.0 188.0 $ <br />70.0 133.1 $ <br />50.0 $ <br />15.0 15.0 $ <br />20.0 36.3 $ <br />$ 5,160.00 $ 610.00 $ 4,550.00 <br />20.00 $ <br />5,900.00 $ <br />62.00 $ <br />598.00 $ <br />10,200.00 $ <br />80.00 $ <br />0.20 $ <br />1.00 $ <br />4.00 $ <br />3.00 $ <br />6.00 $ <br />16.00 $ <br />12.00 $ <br />92.00 $ <br />10.00 $ <br />92.00 $ <br />1,840.00 $ <br />5,900.00 $ <br />12,028.00 $ <br />38,272,00 $ <br />20,400.00 $ <br />3,680.00 $ <br />200.00 $ <br />82,320.00 $ <br />$ 1,840.00 <br />$ 5,900.00 <br />248.00 $ <br />- $ <br />- $ <br />(320.00) $ <br />- $ <br />(72.00) $ <br />180.00 $ - $ <br />192.00 $ - $ <br />450.00 $ - $ <br />450.00 $ (450.00) $ <br />3,008.00 $ 848.00 $ <br />1,597.56 $ 757.56 $ <br />$ (4,600.00) $ <br />150.00 $ - $ <br />3,338.68 $ 1,498.68 $ <br />11,780.00 <br />38,272.00 <br />20,400.00 <br />4,000.00 <br />200.00 <br />82,392.00 <br />180.00 <br />192.00 <br />450.00 <br />900.00 <br />2,160.00 <br />840.00 <br />4,600.00 <br />150.00 <br />1,840.00 <br />1 TOTAL - STREET <br />CONTRACT AMOUNT <br />CHANGE ORDER NO. 1 <br />1 REPLACE GUARDRAIL <br />2 REMOVE DETERIORATED RAILROAD POSTS <br />TOTAL CHANGE ORDER NO. 1 <br />1.0 $ <br />1.0 $ <br />$ 9,366.24 $ (1,945.76) $ 11,312.00 <br />$ 96,846.24 $ (1,407.76) $ 98,254.00 <br />4,672.50 $ <br />781.50 $ <br />4,672.50 $ <br />781.50 $ <br />5,454.00 $ <br />4,672.50 $ <br />781.50 $ <br />5,454.00 $ <br />4,672.50 <br />781.50 <br />5,454.00 <br />TOTAL COMPENSATING CHANGE ORDER NO. 2 <br />$ 102,300.24 $ (1,407.76) $ 103,708.00 <br />• • <br />