COMPENSATING CHANGE ORDER NO. 2 PERIOD ENDING: January 2, 2013
<br />OTTER LAKE SERVICE ROAD CULVERT REPLACEMENT
<br />CITY OF LINO LAKES, MINNESOTA
<br />TKDA PROJECT NO. 14817.003
<br />ITEM
<br />NO. DESCRIPTION
<br />GENERAL
<br />1 MOBILIZATION
<br />2 TRAFFIC CONTROL
<br />3 TOPSOIL BORROW WITH SEED
<br />4 EROSION CONTROL BLANKET CATEGORY 3 WITH SEED
<br />5 SILT FIENCE
<br />CONTRACT QUANTITY UNIT
<br />UNIT QUANTITY TO DATE PRICE
<br />AMOUNT NET
<br />TO DATE CHANGE
<br />1.0 1.0 $ 1,500.00 $ 1,500.00 $
<br />1.0 1.0 $ 300.00 $ 300.00 $
<br />100.0 - $ 0.50 $ - $
<br />400.0 560.0 $ 6.00 $ 3,360.00 $
<br />100.0 - $ 3.00 $ - $
<br />- $
<br />$
<br />(50.00) $
<br />960.00 $
<br />(300.00) $
<br />CONTRACT
<br />AMOUNT
<br />1,500.00
<br />300.00
<br />50.00
<br />2,400.00
<br />300.00
<br />SUBTOTAL - GENERAL
<br />SURFACE WATER MANAGEMENT
<br />1 REMOVE EXISTING 96" CS PIPE
<br />2 DEWATERING / DIVERSION (SEE DETAIL B)
<br />3 TRENCH STABILIZATION -1 1/2" CRISHED OR WASHED ROCK
<br />(SEE DETAIL A)
<br />4 INSTALL 96" RCP
<br />5 INSTALL 96" FES
<br />6 RIP RAP CLASS III
<br />7 GEOOTEXTILE FABRIC
<br />SUBTOTAL - SURFACE WATER MANAGEMENT
<br />STREET
<br />1 REMOVE BITUMINOUS
<br />2 SAW CUT BITUMINOUS
<br />3 REMOVE GUARD RAIL
<br />4 INSTALL GUARD RAIL
<br />5 GRANULAR BORROW
<br />6 5" CLASS 5 AGGREGATE BASE
<br />7 BITUMINOUS BASE COURSE 2380 (LVNW 35038)
<br />8 BITUMINOUS MATERIAL FOR TACK COAT
<br />9 BITUMINOUS WEARING COURSE 2360 (LVWE 45030)
<br />92.0
<br />1.0
<br />190.0
<br />64.0
<br />2.0
<br />50.0
<br />1,000.0
<br />92.0 $
<br />1.0 $
<br />194.0 $
<br />64.0 $
<br />2.0 $
<br />46.0 $
<br />1,000.0 $
<br />180.0 180.0 $
<br />48.0 48.0 $
<br />150.0 150.0 $
<br />150.0 75.0 $
<br />135.0 188.0 $
<br />70.0 133.1 $
<br />50.0 $
<br />15.0 15.0 $
<br />20.0 36.3 $
<br />$ 5,160.00 $ 610.00 $ 4,550.00
<br />20.00 $
<br />5,900.00 $
<br />62.00 $
<br />598.00 $
<br />10,200.00 $
<br />80.00 $
<br />0.20 $
<br />1.00 $
<br />4.00 $
<br />3.00 $
<br />6.00 $
<br />16.00 $
<br />12.00 $
<br />92.00 $
<br />10.00 $
<br />92.00 $
<br />1,840.00 $
<br />5,900.00 $
<br />12,028.00 $
<br />38,272,00 $
<br />20,400.00 $
<br />3,680.00 $
<br />200.00 $
<br />82,320.00 $
<br />$ 1,840.00
<br />$ 5,900.00
<br />248.00 $
<br />- $
<br />- $
<br />(320.00) $
<br />- $
<br />(72.00) $
<br />180.00 $ - $
<br />192.00 $ - $
<br />450.00 $ - $
<br />450.00 $ (450.00) $
<br />3,008.00 $ 848.00 $
<br />1,597.56 $ 757.56 $
<br />$ (4,600.00) $
<br />150.00 $ - $
<br />3,338.68 $ 1,498.68 $
<br />11,780.00
<br />38,272.00
<br />20,400.00
<br />4,000.00
<br />200.00
<br />82,392.00
<br />180.00
<br />192.00
<br />450.00
<br />900.00
<br />2,160.00
<br />840.00
<br />4,600.00
<br />150.00
<br />1,840.00
<br />1 TOTAL - STREET
<br />CONTRACT AMOUNT
<br />CHANGE ORDER NO. 1
<br />1 REPLACE GUARDRAIL
<br />2 REMOVE DETERIORATED RAILROAD POSTS
<br />TOTAL CHANGE ORDER NO. 1
<br />1.0 $
<br />1.0 $
<br />$ 9,366.24 $ (1,945.76) $ 11,312.00
<br />$ 96,846.24 $ (1,407.76) $ 98,254.00
<br />4,672.50 $
<br />781.50 $
<br />4,672.50 $
<br />781.50 $
<br />5,454.00 $
<br />4,672.50 $
<br />781.50 $
<br />5,454.00 $
<br />4,672.50
<br />781.50
<br />5,454.00
<br />TOTAL COMPENSATING CHANGE ORDER NO. 2
<br />$ 102,300.24 $ (1,407.76) $ 103,708.00
<br />• •
<br />
|