IF OVERLAY APPLICATION IS SPECIFIED OR AUTHORIZED BY THE ENGINEER <br />1. TEMPERATURE REQUIREMENTS <br />. MINIMUM AIR TEMPERATURE 60T (16'5) AND RISING <br />MINIMUM PAVEMENT TEMPERATURE 70'F (21'5) AND RISING <br />MINIMUM OVERNIGHT TEMPERATURE 60'F (16'C) AND RISING <br />SURFACE PREPARATION <br />A. ASPHALT -LESS THAN 11 DAYS OLD: <br />1. ALL - SWEEP OR BLOW CLEAN. <br />2. 0 - 3 DAYS OLD - NO PRIMER. <br />3. 4 - 10 DAYS OLD - STAMARK'" SP44 ONLY. <br />4. 11+ DAYS - STAMARK° (OR APPROVED EQUAL) <br />E44 OR SP44 DEPENDING ON APPLICATION <br />SEE MANUFACTURERS SPECIFICATION. <br />3. OLD MARKINGS <br />A. DO NOT APPLY OVER PAINT, EPDXY, OR THERMOPLASTIC <br />UNLESS VERY WELL WORN AND WELL ADHERED TO THE ROAD. <br />OLD MARKINGS MUST BE AT LEAST 75 % -80% WORN AWAY. <br />B. GRIND OR SANDBLAST OLD MARKINGS AND SWEEP OR BLOW <br />SURFACE CLEAN <br />C. APPLY REQUIRED PRIMER <br />4. WORN STAMARK MARKINGS <br />A. OK TO APPLY NEW MATERIAL OVER WORN STAMARK°. <br />REMOVE ALL LOOSE MATERIAL WITH SCRAPER OR KNIFE. <br />B. SWEEP OR BLOW SURFACE CLEAN. <br />200' <br />OR LESS <br />— ARROW AT <br />— MIDPOINT <br />TD. <br />20' <br />30' - 80' <br />OVER 200' <br />Arrows - 8' <br />GENERAL REQUIREMENTS <br />THE ENGINEER'S INVOLVEMENT IN THE APPLICATION OF THE MATERIAL SHALL <br />BE LIMITED TO FIELD SPOTTING, LOCATION AND INSPECTION. THE ENGINEER <br />WILL PLACE NECESSARY "SPOTTING" AT APPROPRIATE POINTS TO PROVIDE <br />HORIZONTAL CONTROL FOR STRIPING AND TO DETERMINE NECESSARY <br />STARTING AND CUTOFF POINTS. BROKEN LINE INTERVALS WILL NOT BE <br />MARKED. LONGITUDINAL JOINTS. PAVEMENT EDGES, AND EXISTING MARKINGS <br />SHALL SERVE AS HORIZONTAL CONTROL WHEN 50 DIRECTED. <br />EDGE LINES AND LANE LINES ARE TO BE BROKEN ONLY AT INTERSECTIONS <br />WITH PUBLIC ROADS AND AT PRIVATE ENTRANCES IF THEY ARE CONTROLLED <br />BY A YIELD SIGN, STOP SIGN, OR TRAFFIC SIGNAL. THE BREAK POINT 15 <br />TO BE AT THE START OF THE RADIUS FOR THE INTERSECTION, OR AT <br />MARKED STOP LINES OR CROSSWALKS. <br />A TOLERANCE OF 1/4" OVER OR UNDER THE SPECIFIED WIDTH WILL BE <br />ALLOWED FOR STRIPING PROVIDED THE VARIATION I5 GRADUAL AND DOES <br />NOT DETRACT FROM THE GENERAL APPEARANCE. BROKEN LINE SEGMENTS <br />MAY VARY UP TO 6" FROM THE SPECIFIED LENGTHS PROVIDED OVER AND <br />UNDER THE VARIATIONS ARE REASONABLY COMPENSATORY. ALIGNMENT <br />DEVIATIONS FROM THE CONTROL GUIDE SHALL NOT EXCEED 2 ". MATERIAL <br />SHALL NOT BE APPLIED OVER LONGITUDINAL JOINT. ESTABLISHMENT OF <br />APPLICATION TOLERANCES SHALL NOT RELIEVE THE CONTRACTOR OF THEIR <br />RESPONSIBILITY TO COMPLY AS CLOSELY AS PRACTICABLE WITH THE PLAN <br />DIMENSIONS. <br />EPDXY <br />THE ROAD SURFACE SHALL BE CLEANED AT THE DIRECTION OF THE <br />ENGINEER JUST PRIOR TO APPLICATION. PAVEMENT CLEANING SHALL <br />CONSIST OF AT LEAST BRUSHING WITH A ROTARY BROOM (NON- <br />METALLIC), OR AS RECOMMENDED BY THE MATERIAL MANUFACTURER <br />AND ACCEPTABLE TO THE ENGINEER. NEW PORTLAND CEMENT <br />CONCRETE SURFACES SHALL BE SANDBLAST CLEANED TO REMOVE ANY <br />SURFACE TREATMENTS AND /OR LAITANCE ON LOW SPEED (SPEED LIMIT <br />35 MPH OR LESS) URBAN PORTLAND CEMENT CONCRETE ROADWAYS. <br />SANDBLAST CLEANING SHALL BE USED FOR ALL EPDXY PAVEMENT <br />MARKINGS. <br />THE EPDXY MARKING APPLICATION SHALL IMMEDIATELY FOLLOW THE <br />PAVEMENT CLEANING. GLASS BEADS SHALL BE APPLIED IMMEDIATELY <br />AFTER APPLICATION OF THE EPDXY RESIN LINE TO PROVIDE AN <br />IMMEDIATE NO -TRACK SYSTEM. <br />AN EPDXY RESIN LINE 4 INCHES WIDE AND 15 MIL THICKNESS (WET), <br />REQUIRES AN APPLICATION RATE OF (1) GAL OF COMPONENTS FOR <br />320 FT OF LINE. GLASS BEADS SHALL BE APPLIED AT A POUND <br />PER GALLON RATE SUFFICIENT TO ACHIEVE AN ACCEPTABLE NO -TRACK <br />OPERATIONS SHALL BE CONDUCTED ONLY WHEN THE ROAD PAVEMENT <br />SURFACE TEMPERATURES ARE 50'F OR GREATER. <br />PERMANENT PAVEMENT MARKINGS SHALL NOT BE PLACED OVER <br />TEMPORARY MARKINGS. <br />PAINT <br />AT THE TIME OF APPLYING THE MARKING MATERIAL, THE APPLICATION <br />AREA SHALL BE FREE OF CONTAMINATION. THE CONTRACTOR SHALL <br />CLEAN THE ROADWAY SURFACE PRIOR TO THE LINE APPLICATION IN A <br />MANNER AND TO THE EXTENT REQUIRED BY THE ENGINEER. <br />GLASS BEADS SHALL BE APPLIED IMMEDIATELY AFTER APPLICATION OF <br />THE PAINT LINE. <br />EXCEPT WHEN USED AS A TEMPORARY MARKING, PAVEMENT MARKINGS <br />SHALL ONLY BE APPLIED IN SEASONABLE WEATHER WHEN AIR <br />TEMPERATURE IS 50 DEGREES OR HIGHER AND SHALL NOT BE <br />APPLIED WHEN THE WIND OR OTHER CONDITIONS CAUSE A FILM OF <br />DUST TO BE DEPOSITED ON THE PAVEMENT SURFACE AFTER CLEANING <br />AND BEFORE THE MARKING MATERIAL CAN BE APPLIED. <br />THE FILLING OF TANKS, POURING OF MATERIALS OR CLEANING OF <br />EQUIPMENT SHALL NOT BE PREFORMED ON UNPROTECTED SURFACES <br />UNLESS ADEQUATE PROVISIONS ARE MADE TO PREVENT SPILLAGE OF <br />MATERIAL. <br />TYPICAL MESSAGE PLACEMENT FOR TURN LANES <br />E <br />A A 1 <br />SIZE 6' x 8' <br />PAVEMENT MARKING DETAIL <br />(EPDXY) <br />DIMENS ON TABLE <br />A <br />G <br />LINO LAKES, MINNESOTA <br />SA.P. 210 -114 -001 SIGNING AND STRIPING DETAILS <br />SHEET 15 OF 28 SHEETS <br />• <br />• <br />• <br />