My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2013-021 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2013
>
2013-021 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2014 12:45:04 PM
Creation date
10/1/2014 12:29:47 PM
Metadata
Fields
Template:
City Council
Council Document Type
Master List Resolution
Meeting Date
02/11/2013
Council Meeting Type
Regular
Resolution #
13-021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It is agreed that the Exhibit "A" Layout dated January 25, 2013 has been reviewed and accepted by the <br />parties and is suitable for preparation of final construction documents. Any significant changes made <br />hereafter to the design as presented in the Exhibit "A" Layout will require approval by the parties as an <br />amendment to this JPA. These same changes will require a change in the cost share to include any <br />additional design engineering costs that may occur. <br />II. METHOD <br />The County shall cause the construction of Anoka County Project SP 002 - 614 -035, in <br />conformance with proposed engineering plans and specifications. <br />IMPROVEMENTS <br />It is agreed by the parties that in 2013 a pedestrian and bicycle trail along CSAH 14 will be constructed. <br />Improvements include but are not limited to: a pedestrian and bicycle bridge and bituminous trail. The <br />costs of these improvements have been estimated for this agreement and will be finalized after bids have <br />been received. These costs will be paid by the County. <br />RIGHT OF WAY: <br />No right -of -way is required for this project. Any City owned property or easements required for the <br />construction will be conveyed to the County at no cost. <br />BITUMINOUS TRAIL: <br />The parties agree that the construction of the bituminous trail leading up to the pedestrian and bicycle <br />bridge is eligible for federal funds and that the County will be responsible for the local match. <br />The parties understand that the cost for the trail includes: bituminous surfacing, aggregate base, <br />excavation (including muck excavation), borrow material (granular and topsoil), and turf establishment. <br />The parties agree that the County will pay for the design of the trail, and any removal items, required to <br />construct the trail. <br />PERMITS: <br />The parties agree that the County will secure all necessary permits for this Project. The City agrees to <br />coordinate with the County in securing the permits required by the Rice Creek Watershed District, city <br />permits, MnDOT permits as well as any other permits that may be required. <br />III. COSTS <br />The contract costs of the work, or if the work is not contracted, the cost of all labor, materials, <br />normal engineering costs and equipment rental required to complete the work, shall constitute the actual <br />"construction costs" and shall be so referred to herein. "Estimated costs" are good faith projections of <br />the costs, which will be incurred for this project. Actual costs will vary and those will be the costs for <br />which the relevant parties will be responsible. <br />2 <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.