Laserfiche WebLink
• <br />• <br />Forest View Acres 2nd Addition <br />Development Contract <br />March, 2013 <br />payment of all costs incurred by the City related to the development of the <br />Subdivision and the Developer Improvements including, but not limited to, the <br />following (See Attachment B for breakdown of costs): <br />1. Planner Review Fee <br />2. Administration - 3% Construction Cost <br />3. Engineering <br />4. Legal <br />5. Publications <br />6. Park Dedication Fee <br />7. Street - Storm Sewer - Pond Maintenance <br />8. Aerial Photo Recovery Cost <br />B. If the above escrow amounts are insufficient, the Developer shall make such <br />additional deposits as required by the City. The City shall have a right to reimburse <br />itself from the Escrow upon notice to the Developer, with suitable documentation <br />supporting charge. <br />VI. TRUNK UTILITY & SURFACE WATER MANAGEMENT CHARGES <br />A. Trunk Sewer Unit Charges. The City has established trunk unit charges to <br />uniformly distribute the costs of public trunk sanitary sewer infrastructure. Each <br />individual connection to the sanitary sewer system shall be charged a unit charge <br />per SAC unit (currently at $2,911 per SAC unit) at the time of building permit <br />issuance. The unit charge shall be based on the procedure outlined in the <br />Metropolitan Environmental Services Service Availability Charge Procedure <br />Manual. Trunk sewer unit charges addressed under this paragraph are in addition <br />to any SAC charges imposed by Metropolitan Council Environmental Services. <br />An estimate of the total charge and the trunk utility credit for developer installed <br />trunk oversizing is specified in Attachment A. <br />B. Trunk Water Unit Charges. The City has established trunk unit charges to <br />uniformly distribute the costs of public trunk water infrastructure. Each <br />individual connection to the water system shall be charged a unit charge per SAC <br />unit (currently at $3,854 per SAC unit) at the time of building permit issuance. <br />The unit charge shall be based on the procedure outlined in the Metropolitan <br />Environmental Services Service Availability Charge Procedure Manual. An <br />estimate of the total charge and the trunk utility credit for developer installed <br />trunk oversizing is specified in Attachment A. <br />page 8 <br />