My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-06-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
10-06-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2015 12:28:55 PM
Creation date
10/1/2014 4:14:44 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/06/2014
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WS – Item #1 <br /> <br />WORK SESSION STAFF REPORT <br />Work Session Item No. 1 <br /> <br /> <br />Date: October 6, 2014 <br /> <br />To: City Council <br /> <br />From: John Swenson, Michael Grochala, Jeff Karlson <br /> <br />Re: Preliminary Site and Building Plan Review for Fire Station at Birch St. & <br />Centerville Rd. <br /> <br /> <br />Background <br /> <br />Following selection of the preferred building site on August 11, 2014, staff has been actively <br />working with the design team to develop a schematic site plan and floor plan that meets the <br />future needs of the Lino Lakes Public Safety Department. Staff had the opportunity to visit other <br />fire facilities and to meet with fire personnel in preparation for programming the new station. <br /> <br />Quinn Hutson of CNH Architects will be present at the meeting to provide an overview of the <br />progress that has been made to this point and to discuss the four primary components of the <br />project, which includes site plan, floor plan, floor image, and cost estimate. <br /> <br />The proposed floor plan accommodates the day-to-day training and operational needs of the <br />department while also providing a community meeting room. <br /> <br />Off-Site Improvements <br /> <br />Staff is also working with WSB and Associates to develop plans for the extension of sanitary <br />sewer and water main, and for turn lane improvements to service the site. Development of this <br />site should also include evaluation and planning for co-location of other municipal services. Co- <br />location provides financial benefit to the community in terms of shared costs. For example, the <br />drive lanes and turn lanes will provide access not only to the fire station but also the future <br />recreational complex. There are also plans for a well, pump house, and water reservoir on the <br />site. Staff is continuing to evaluate placement of a public works facility in this location that <br />would result in long-term savings for the community. <br /> <br />Requested Council Direction <br /> <br />Staff is requesting council comment on the preliminary plans. <br /> <br />Attachments <br /> <br />None. <br />
The URL can be used to link to this page
Your browser does not support the video tag.