Laserfiche WebLink
• <br />• <br />Project: 02029 -19 - LINO - Otter Lake Road Extension <br />Engineers Estimate <br />Kuechle Underground <br />Frattalone Companies, <br />Inc. <br />Douglas -Ke r <br />Underground, LLC <br />Item No. <br />Item <br />Units <br />Quantity <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />35 <br />2573.502 <br />SILT FENCE, TYPE PREASSEMBLED <br />LIN FT <br />1000 <br />$3.50 <br />$3,500.00 <br />$1.50 <br />$1,500.00 <br />$1.80 <br />$1,800.00 <br />$1.50 <br />$1,500.00 <br />36 <br />2573.530 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />7 <br />$350.00 <br />$2,450.00 <br />$150.00 <br />$1,050.00 <br />$150.00 <br />$1,050.00 <br />$175.00 <br />$1,225.00 <br />37 <br />2573.602 <br />TEMPORARY ROCK CONSTRUCTION ENTRANCE <br />EACH <br />1 <br />$2,500.00 <br />$2,500.00 <br />$750.00 <br />$750.00 <br />$2,000.00 <br />$2,000.00 <br />$1,500.00 <br />$1,500.00 <br />38 <br />2575.501 <br />SEEDING <br />ACRE <br />1.25 <br />$10,000.00 <br />$12,500.00 <br />$880.00 <br />$1,100.00 <br />$200.00 <br />$250.00 <br />$875.00 <br />$1,093.75 <br />39 <br />2575.502 <br />SEED MIXTURE 260 <br />POUND <br />70 <br />$5.00 <br />$350.00 <br />$2.55 <br />$178.50 <br />$3.75 <br />$262.50 <br />$2.55 <br />$178.50 <br />40 <br />2575.502 <br />SEED MIXTURE 310 <br />POUND <br />20 <br />$8.00 <br />$160.00 <br />$17.00 <br />$340.00 <br />$4.50 <br />$90.00 <br />$16.75 <br />$335.00 <br />41 <br />2575.505 <br />SODDING TYPE SALT RESISTANT <br />SQ YD <br />240 <br />$3.00 <br />$720.00 <br />$4.65 <br />$1,116.00 <br />$8.50 <br />$2,040.00 <br />$4.65 <br />$1,116.00 <br />42 <br />2575.511 <br />MULCH MATERIAL TYPE 1 <br />TON <br />2 <br />$250.00 <br />$500.00 <br />$530.00 <br />$1,060.00 <br />$1,200.00 <br />$2,400.00 <br />$525.00 <br />$1,050.00 <br />43 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />SQ YD <br />1000 <br />$3.00 <br />$3,000.00 <br />$1.30 <br />$1,300.00 <br />$1.35 <br />$1,350.00 <br />$1.30 <br />$1,300.00 <br />44 <br />2575.532 <br />FERTILIZER TYPE 2 <br />POUND <br />200 <br />$1.00 <br />$200.00 <br />$1.25 <br />$250.00 <br />$1.30 <br />$260.00 <br />$1.25 <br />$250.00 <br />45 <br />2582.501 <br />PAVEMENT MESSAGE (LEFT ARROW) POLY PREFORM <br />EACH <br />2 <br />$250.00 <br />$500.00 <br />$260.00 <br />$520.00 <br />$400.00 <br />$800.00 <br />$256.00 <br />$512.00 <br />46 <br />2582.501 <br />PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORM <br />EACH <br />4 <br />$250.00 <br />$1,000.00 <br />$260.00 <br />$1,040.00 <br />$400.00 <br />$1,600.00 <br />$256.00 <br />$1,024.00 <br />47 <br />2582.501 <br />PAVEMENT MESSAGE (RIGHT -THRU ARROW) POLY PREFORM <br />EACH <br />3 <br />$275.00 <br />$825.00 <br />$510.00 <br />$1,530.00 <br />$650.00 <br />$1,950.00 <br />$512.00 <br />$1,536.00 <br />48 <br />2582.502 <br />4" SOLID LINE WHITE -EPDXY <br />LIN FT <br />1000 <br />$1.00 <br />$1,000.00 <br />$0.95 <br />$950.00 <br />$0.25 <br />$250.00 <br />$0.95 <br />$950.00 <br />49 <br />2582.502 <br />12" SOLID LINE WHITE -EPDXY <br />LIN FT <br />50 <br />$6.00 <br />$300.00 <br />$8.00 <br />$400.00 <br />$6.00 <br />$300.00 <br />$8.10 <br />$405.00 <br />50 <br />2582.502 <br />4" DOUBLE SOLID LINE YELLOW -EPDXY <br />LIN FT <br />240 <br />$2.00 <br />$480.00 <br />$1.90 <br />$456.00 <br />$0.52 <br />$124.80 <br />$1.90 <br />$456.00 <br />Total SCHEDULE A - SURFACE IMPROVEMENTS: <br />$280,347.00 <br />$235,509.95 <br />$256,539.90 <br />$253,877.00 <br />SCHEDULE B - SANITARY SEWER IMPROVEMENTS <br />51 <br />2451.609 <br />AGGREGATE FOUNDATION <br />TON <br />50 <br />$10.00 <br />$500.00 <br />$15.00 <br />$750.00 <br />$42.14 <br />$2,107.00 <br />$31.25 <br />$1,562.50 <br />52 <br />2503.602 <br />CONNECT TO EXISTING SANITARY SEWER <br />EACH <br />1 <br />$2,500.00 <br />$2,500.00 <br />$600.00 <br />$600.00 <br />$1,530.00 <br />$1,530.00 <br />$3,900.00 <br />$3,900.00 <br />53 <br />2503.603 <br />8" PVC PIPE SEWER - SDR 26 <br />LIN FT <br />390 <br />$38.00 <br />$14,820.00 <br />$51.00 <br />$19,890.00 <br />$22.30 <br />$8,697.00 <br />$54.90 <br />$21,411.00 <br />54 <br />2503.603 <br />TELEVISE SANITARY SEWER <br />LIN FT <br />390 <br />$2.00 <br />$780.00 <br />$1.50 <br />$585.00 <br />$3.20 <br />$1,248.00 <br />$2.00 <br />$780.00 <br />55 <br />2506.516 <br />CASTING ASSEMBLY (MANHOLE) <br />EACH <br />2 <br />$500.00 <br />$1,000.00 <br />$700.00 <br />$1,400.00 <br />$480.00 <br />$960.00 <br />$696.40 <br />$1,392.80 <br />56 <br />2506.602 <br />CHIMNEY SEAL <br />EACH <br />2 <br />$200.00 <br />$400.00 <br />$140.00 <br />$280.00 <br />$744.00 <br />$1,488.00 <br />$233.90 <br />$467.80 <br />57 <br />2506.603 <br />CONSTRUCT 48" DIAMETER SANITARY SEWER MANHOLE <br />LIN FT <br />43 <br />$175.00 <br />$7,525.00 <br />$150.00 <br />$6,450.00 <br />$152.20 <br />$6,544.60 <br />$234.35 <br />$10,077.05 <br />Total SCHEDULE B - SANITARY SEWER IMPROVEMENTS: <br />$27,525.00 <br />$29,955.00 <br />$22,574.60 <br />$39,591.15 <br />SCHEDULE C - WATER MAIN IMPROVEMENTS <br />58 <br />2451.609 <br />GRANULAR FOUNDATION AND /OR BEDDING <br />TON <br />50 <br />$10.00 <br />$500.00 <br />$13.00 <br />$650.00 <br />$11.05 <br />$552.50 <br />$11.20 <br />$560.00 <br />59 <br />2504.602 <br />CONNECT TO EXISTING WATER MAIN <br />EACH <br />1 <br />$1,000.00 <br />$1,000.00 <br />$1,200.00 <br />$1,200.00 <br />$2,310.00 <br />$2,310.00 <br />$1,560.00 <br />$1,560.00 <br />60 <br />2504.602 <br />HYDRANT <br />EACH <br />1 <br />$3,000.00 <br />$3,000.00 <br />$4,000.00 <br />$4,000.00 <br />$3,830.00 <br />$3,830.00 <br />$3,656.30 <br />$3,656.30 <br />61 <br />2504.602 <br />16" BUTTERFLY VALVE AND BOX <br />EACH <br />2 <br />$8,500.00 <br />$17,000.00 <br />$3,500.00 <br />$7,000.00 <br />$2,660.00 <br />$5,320.00 <br />$3,809.65 <br />$7,619.30 <br />62 <br />2504.602 <br />6" GATE VALVE AND BOX <br />EACH <br />1 <br />$1,200.00 <br />$1,200.00 <br />$1,400.00 <br />$1,400.00 <br />$1,110.00 <br />$1,110.00 <br />$1,292.15 <br />$1,292.15 <br />63 <br />2504.602 <br />8" GATE VALVE AND BOX <br />EACH <br />2 <br />$2,000.00 <br />$4,000.00 <br />$2,100.00 <br />$4,200.00 <br />$1,560.00 <br />$3,120.00 <br />$1,754.25 <br />$3,508.50 <br />64 <br />2504.603 <br />HYDRANT EXTENSION <br />LIN FT <br />1 <br />$500.00 <br />$500.00 <br />$730.00 <br />$730.00 <br />$570.00 <br />$570.00 <br />$593.30 <br />$593.30 <br />65 <br />2504.603 <br />VALVE BOX EXTENSION <br />LIN FT <br />1 <br />$100.00 <br />$100.00 <br />$200.00 <br />$200.00 <br />$90.00 <br />$90.00 <br />$92.00 <br />$92.00 <br />